Identification of Waste Supply Chain Flow to Improve Performance
DOI:
https://doi.org/10.22441/ijiem.v3i2.14929Keywords:
waste supply chain, Arena software, performanceAbstract
Semarang city has the amount of waste that piled up in the Landfill as much as 850 tons/day with the amount of unmanaged waste as is 100 tons/day. This phenomenon needs to be identified and evaluated for the flow of waste disposal from upstream to downstream. Therefore, the purpose of this study is to identify the flow of the waste supply chain and simulate it to determine the performance of waste handling in an area. The research method begins with a supply chain questionnaire which will then be statistically tested to be used as input for supply chain flow generation and simulation using Arena software. Based on the identification of the supply chain, the flow of the waste supply chain in the Wonosari area of Semarang is from households to the garbage dump to be taken to the landfill as far as 10 km. From the landfill, it is further processed into a selling value product. In this study, waste from the landfill is also the input material for the paving block production workshop (WPBP FT) at the Faculty of Engineering, Dian Nuswantoro University. Plastic waste will be used as a mixed material for making paving blocks. The supply chain simulation results using Arena show that the performance is good.
Downloads
References
Abida, I, T and Oke, S.A. (2022). The Application of Taguchi WSM, Taguchi WPM and Taguchi WASPAS Multicriteria Method to Optimize Downtime in Production Process, Industrial Journal of Industrial Engineering and Management. 3 (1), pp.1-13. http://dx.doi.org/10.22441/ijiem.v3i1
Abida, I, T and Oke, S.A. (2022). Fuzzy Analitic Hiererachy Process and Markov Chain-WSM/WPM/WAPAS Approached to Solving the Surface Royghness Problem in Boring Steel 15 2062 GR E250 Plates on CNC Machines, Industrial Journal of Industrial Engineering and Management. 3 (1), pp.47-71. http://dx.doi.org/10.22441/ijiem.v3i1
Box, G.E., Hunter, J.S., Hunter, W.G., 2005. Statistics for Experimenters: Design, Innovation and Discovery. 2nd Edition. USA: John Wiley & Sons, Inc
DLH CITY OF SEMARANG. (2019). Semarang City Waste Production. Retrieved from the Semarang City Environmental Service: htGarbage Dump://dlh.semarangkota.go.id/berita /
Ha, B.C., Lim, S.Y., and Le, C,. (2001). Impact of Organization Internal Green Supply Chain Management on Customer’s Purchasing Behaviour for Personal Care Products. Operation and Supply ChainManagement, 14 (3), pp.338-350.
Hair, J.F., Black, B.C., Babin, B.J., and Anderson, R.E, 2010. Multivariate Data Analysis: A Global Persective (7th ed.), Person, pp.133-147
Herart, S,. and Chong, S.C. (2001). Key Component and Critical Success Factors for Project management Success: A Literature Review. Operation and Supply ChainManagement, 14 (3), pp.431-443.
Khentout , A., Kezzar, M, Khochemane, L., 2019. Taguchi Optimization and Experimental Investigation of the Penetration Rate of Compact Polycrystalline Diamond Drilling Bits in Calcareous Rocks. International JournaI of Technology, Volume 10(2), pp. 225–235
Montgomery, D.C., 2001. Design and Analysis of Experiments. 5th Edition. USA: John Wiley & Sons, Inc
National Waste Management Information System. (2018). Waste Management Data. Retrieved from SIPSN (National Waste Management Information System): http://sipsn.menlhk.go.id/?q=3a-data-umum
Okaminiwei, L and Oke, S.A. (2020). Optimization of Maintenance Downtime for Handling equipment in a Container Terminal using Taguchi Scheme, Taguchi Pareto Methods and Taguchi ABC Method, Industrial Journal of Industrial Engineering and Management. 1 (2), pp.69-90. http://dx.doi.org/10.22441/ijiem.v1i2
Orenstein, P., and Tang, H., (2001). Identifying the Relation between Supply Chain Networks Structure and Its Overall Finacial Performance. Operation and Supply ChainManagement, 14 (4), pp.399-409.
Research and Development Agency of the Ministry of Home Affairs. (2018). Research: 24 Percent of Waste in Indonesia is Still Unmanaged. Retrieved from the Ministry of Home Affairs Research and Development Agency: http://litbang.kemendagri.go.id/website/riset-24-persen-sampah-di-indonesia-masih-tak-terkelola/
Setyaningrum, R., (2020). Simulation and modeling of waste management Flow become catfish feed. TekInfo, 8. Pp.34-44. htGarbage Dump://doi.org/10.31001/tekinfo.v8i2.800.
Setyaningrum, R., Subagyo, and Wijaya, A.R., 2020, A mathematichal model of Factors Driving Product Success in an Indonesian Market Using Design Experiment, International Journal of Technology, 11 (2), pp.322-332. htGarbage Dump://doi.org/10.14716/ijtech.v11i2.3428 .
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









