Soybean Inventory Management at Gesit Tahu Factory Using the Economic Order Quantity (EOQ) Method

Authors

  • Rahmat Hidayat Faculty of Engineering, Mulawarman University, Jalan Sambaliung No.9, Samarinda City, East Kalimantan 75119 http://orcid.org/0009-0001-3318-2424
  • Wahyuda Wahyuda Faculty of Engineering, Mulawarman University, Jalan Sambaliung No.9, Samarinda City, East Kalimantan 75119
  • Farida Djumiati Sitania Faculty of Engineering, Mulawarman University, Jalan Sambaliung No.9, Samarinda City, East Kalimantan 75119

DOI:

https://doi.org/10.22441/ijiem.v5i2.22938

Keywords:

EOQ, Raw materials, Supplies, Efficient, Ordering cost

Abstract

Gesit Tahu is a small-scale factory engaged in the tofu industry, in the production process is closely related to the supply of the main raw material, namely soybeans. Gesit Tahu has not been optimal in controlling the level of raw material inventory where this factory has experienced a shortage of soybean inventory due to high demand, so it requires a method that can optimize raw material purchases and minimize inventory costs, the right method in solving this problem is using the Economic Order Quantity (EOQ) method. The purpose of this study is to determine the inventory control of Gesit Tahu soybean raw materials by comparing the current inventory management policy at the factory and using the EOQ method. The results of this study that inventory control is more efficient using the EOQ method, it is proven that it can make savings from the cost factor that must be incurred, it can be seen that if the Gesit Tahu factory applies the EOQ method, namely IDR 2,223,077,461, it is a minimum compared to the factory policy method within one year, which is IDR 2,223,619,662. The optimal order quantity for soybean needs is 72.87 sacks (73 sacks) for one order. The frequency of ordering soybean needs is 43.49 or 44 times/year. The calculation of safety stock to anticipate unexpected shortages is 1.64 sacks or 2 sacks. The calculation of the reorder point obtained to determine the point at which the order is placed again so that the ordered goods arrive on time before the inventory runs out is 21.93 sacks or 22 sacks.

Downloads

Download data is not yet available.

References

Aldillah, R. (2015). Proyeksi produksi dan konsumsi kedelai Indonesia. Jurnal Ekonomi Kuantitatif Terapan, 8(1), 44324.

Aman, S., Fitria, H., & Hakim, C. B. (2023). Analisa Peramalan Penjualan Tas Kerajinan Ekspor Dengan Metode Moving Average Di CV. Sindocraft. Jurnal Teknologi dan Manajemen Industri, 4(1), 1-6.

Badan Pusat Statistik Jakarta Pusat. (2022). Rata-Rata Konsumsi Per kapita Seminggu 2007-2022. Retrieved October 1, 2022, from Badan Pusat Statistik website: https://www.bps.go.id/subject/5/konsumsi-dan-pengeluaran.html

Bahagia, S. N. (2006). Sistem Inventor. Bandung: ITB Press.

Daud, M. N. (2017). Analisis Pengendalian Persediaan Bahan Baku Produksi Roti Wilton Kualasimpang. Jurnal Samudra Ekonomi Dan Bisnis, 8(2), 760–774. https://doi.org/10.33059/jseb.v8i2.434

Lahu, E. P. L., & Sumarauw, J. S. B. (2017). Analisis Pengendalian Persediaan Bahan Baku Guna Meminimalkan Biaya Persediaan pada Dunkin Donuts Manado. Jurnal EMBA, 5(3), 4175–4184. https://doi.org/10.35794/emba.5.3.2017.18394

Lusiana, A., & Yuliarty, P. (2020). Penerapan Metode Peramalan (Forecasting) pada Permintaan Atap di PT X. Industri Inovatif : Jurnal Teknik Industri, 10(1), 11–20. https://doi.org/10.36040/industri.v10i1.2530

Hudori, M. (2018). Formulasi Model Safety Stock dan Reorder Point untuk Berbagai Kondisi Persediaan Material. Jurnal Citra Widya Edukasi, 10(3), 217-224.

Makridakis, S., Wheelwright, S. C., & McGee, V. E. (1993). Metode dan Aplikasi Peramalan (2nd ed.; U. S. Andriyanto & A. Basith, Trans.). Jakarta: Erlangga.

Rabbani, K. J., Wahyuda, W., & Sitania, F. D. (2022). Analisis Pengendalian Persediaan Kedelai pada PRIMKOPTI Guna Memenuhi Kebutuhan Produksi Industri Tahu Tempe di Balikpapan. G-Tech, 6(2), 284–294. https://doi.org/10.33379/gtech.v6i2.1709

Rusdiana, A. (2014). Manajemen Operasi (p. 402). Bandung: CV. Pustaka Setia.

Ryando, D., & Susanti, W. (2019). Penerapan Metode Economic Order Quantity (EOQ) untuk menentukan Safety Stock dan Reorder Point (Studi Kasus: PT. Sinar Glassindo Jaya). Jurnal Mahasiswa Aplikasi Teknologi Komputer dan Informasi (JMApTeKsi), 1(1), 76-84.

Susanti, S., & Arief, K. (2021). Implementasi Just In Time System Dalam Meningkatkan Efisiensi Biaya Persediaan Bahan Baku. Indonesian Accounting Literacy Journal, 1(3), 621–636. https://doi.org/10.35313/ialj.v1i3.3302

Vikaliana, R., Sofian, Y., Solihati, N., Adji, D. B., & Maulia, S. S. (2020). Manajemen Persediaan. Media Sains Indonesia.

Wiharja, A. F., & Ningrum, H. F. (2020). Analisis Prediksi Penjualan Produk PT. Joenoes Ikamulya Menggunakan 4 Metode Peramalan Time Series. Jurnal Bisnisman : Riset Bisnis Dan Manajemen, 2(1), 43–51. https://doi.org/10.52005/bisnisman.v2i1.23

Downloads

Published

2024-11-20

How to Cite

1.
Hidayat R, Wahyuda W, Sitania FD. Soybean Inventory Management at Gesit Tahu Factory Using the Economic Order Quantity (EOQ) Method. IJIEM [Internet]. 2024 Nov. 20 [cited 2026 May 28];5(2):477-86. Available from: https://training-ojs3-publikasi.mercubuana.ac.id/index.php/ijiem/article/view/22938

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 2 3 4 5 6 7 

You may also start an advanced similarity search for this article.