[1]
Abiola, I.T. and Oke, S.A. 2022. The Application of Taguchi-WSM, Taguchi-WPM and Taguchi-WASPAS Multicriteria Methods to Optimize Downtime in a Production Process. IJIEM - Indonesian Journal of Industrial Engineering and Management. 3, 1 (Feb. 2022), 1–13. DOI:https://doi.org/10.22441/ijiem.v3i1.13221.