Perencanaan Proyek Struktur Semi Gantry Crane Menggunakan Critical Chain Project Management
DOI:
https://doi.org/10.22441/oe.2022.v14.i2.051Keywords:
buffer time, critical chain project management, cut & paste method, project planningAbstract
Project completion work has problems related to project completion not being on time, thereby increasing costs and resources. The work on the gantry crane structure includes projects that experience problems related to incompatibility between project planning and actual project work. This study aims to plan project activities by speeding up processing time and providing prevention strategies to minimize project delays. This study uses the critical chain project management method using the cut & paste method by 30%. The results showed the total buffer time was ten days, consisting of eight project buffer days and two feeding buffer days. The total time for the semi-gantry crane structure project has accelerated from 43 days to 33 days. Suggestions for prevention that can be done to complete the project according to the plan are adding project workers, adding tools or machines, and eliminating multitasking activities that cause project workers not to finish their work immediately.
Downloads
References
Ghaffari, M., & Emsley, M. W. (2015). Current status and future potential of the research on Critical Chain Project Management. Surveys in Operations Research and Management Science, 20(2), 43–54. https://doi.org/10.1016/j.sorms.2015.10.001
Goldratt, E. M. (1997). Critical Chain. North River Press. https://books.google.co.id/books?id=FKimAILd3NsC
Habibi, A., Supriyadi, S., & Wibowo, T. J. (2016). Analisis Penjadwalan Pembuatan Heat Exchanger Menggunakan Critical Path Method. Jurnal INTECH Teknik Industri Universitas Serang Raya, 2(1), 19–27. https://doi.org/10.30656/intech.v2i1.860
Hall, N. G. (2012). Project management: Recent developments and research opportunities. Journal of Systems Science and Systems Engineering, 21(2), 129–143. https://doi.org/10.1007/s11518-012-5190-5
Hebert, J. E., & Deckro, R. F. (2011). Combining contemporary and traditional project management tools to resolve a project scheduling problem. Computers & Operations Research, 38(1), 21–32. https://doi.org/10.1016/j.cor.2009.12.004
Hindar, N. I. (2014). Analisis Jalur Kritis untuk Mengatasi Keterlambatan Proses Pemasangan Produk Interior Furniture dengan Metode Pert pada Salah Satu Proyek PT Pap Cabang Bandung. Jurnal Operations Excellence: Journal of Applied Industrial Engineering, 6(3), 290–308. https://publikasi.mercubuana.ac.id/index.php/oe/article/view/517
Horine, G. (2009). Absolute Beginner’s Guide to Project Management. Que. https://books.google.co.id/books?id=lvUQmQEACAAJ
Izmailov, A., Korneva, D., & Kozhemiakin, A. (2016). Effective Project Management with Theory of Constraints. Procedia - Social and Behavioral Sciences, 229, 96–103. https://doi.org/10.1016/j.sbspro.2016.07.118
Jo, S.-H., Lee, E.-B., & Pyo, K.-Y. (2018). Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A case-study on oil and gas projects, the piping process. Sustainability, 10(6), 1–22. https://doi.org/10.3390/su10061817
Leach, L. P. (1999). Critical Chain Project Management Improves Project Performance. Project Management Journal, 30(2), 39–51. https://doi.org/10.1177/875697289903000207
Leach, L. P. (2014). Critical Chain Project Management, Third Edition. Artech House. https://books.google.co.id/books?id=UOxPAwAAQBAJ
Liu, J., & Whangbo, T.-K. (2012). A Study on the Buffer Sizing Method of CCPM Technique Using Statistical Analysis. Convergence and Hybrid Information Technology (pp. 672–679). Springer Berlin Heidelberg. https://doi.org/10.1007/978-3-642-32692-9_84
Long, L. D., & Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26(6), 688–698. https://doi.org/10.1016/j.ijproman.2007.09.012
Miranda, S., & Tripiawan, W. (2019). Perbandingan Penentuan Waktu Baku Menggunakan Metode Time Study dan Critical Path Method (CPM). Jurnal Sistem Dan Manajemen Industri, 3(1), 19–30. https://doi.org/10.30656/jsmi.v3i1.1418
Nalhadi, A., & Suntana, N. (2017). Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM). Jurnal Sistem Dan Manajemen Industri, 1(1), 35. https://doi.org/10.30656/jsmi.v1i1.167
Nasution, S. R. (2014). Penerapan Metode Critical Chain Project Management untuk Perencanaan Proyek Very Low Pressure Phase-II KEI Ltd. Jurnal Teknologi Technoscientia, 6(2), 211–221. https://ejournal.akprind.ac.id/index.php/technoscientia/article/view/573
Nugroho, W., Faiizuddaroini, M., Nalhadi, A., Suryani, S., & Supriyadi, S. (2020). Evaluation of Fabrication Concrete Wave Breaker Project Scheduling with the Critical Chain Project Management Method, Proceedings of the 1st International Multidisciplinary Conference on Education, Technology, and Engineering (IMCETE 2019). 170–173. https://doi.org/10.2991/assehr.k.200303.041
Ordoñez, R. E. C., Vanhoucke, M., Coelho, J., Anholon, R., & Novaski, O. (2019). A Study of the Critical Chain Project Management Method Applied to a Multiproject System. Project Management Journal, 50(3), 322–334. https://doi.org/10.1177/8756972819832203
Parekh, V., Asnani, K., Bhatt, Y., & Mulchandani, R. (2020). Comparison between Critical Path Method (CPM) and Last Planners System (LPS) for Planning and Scheduling METRO Rail Project of Ahmedabad. CIGOS 2019, Innovation for Sustainable Infrastructure. 519–524. https://doi.org/10.1007/978-981-15-0802-8_81
Pellerin, R., & Perrier, N. (2019). A review of methods, techniques and tools for project planning and control. International Journal of Production Research, 57(7), 2160–2178. https://doi.org/10.1080/00207543.2018.1524168
Prajapati, M. P., & Yadav, N. B. (2017). Buffer Based CCPM Scheduling: A Modern Approach for Indian Constraints. Kalpa Publications in Civil Engineering, 1, 291–300. https://easychair.org/publications/paper/xd6
Rand, G. K. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18(3), 173–177. https://doi.org/10.1016/S0263-7863(99)00019-8
Roghanian, E., Alipour, M., & Rezaei, M. (2018). An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), 1–13. https://doi.org/10.1080/15623599.2016.1225327
Sahrupi, S., Supriyadi, S., & Harisni, M. U. (2021). Usulan Penerapan Metode Lean Project Management Pada Pembangunan Pelebaran Gedung Gitet Cilegon Baru PT. PLN (Persero). Operations Excellence Journal of Applied Industrial Engineering, 13(3), 407–420. https://doi.org/10.22441/oe.2021.v13.i3.037
San Cristóbal, J. R., Carral, L., Diaz, E., Fraguela, J. A., & Iglesias, G. (2018). Complexity and Project Management: A General Overview. Complexity, 2018, 4891286. https://doi.org/10.1155/2018/4891286
Saputra, A., Putra, G., & Aguslita, F. (2021). Pengendalian Waktu Proyek Menggunakan Metode Critical Chain Project Management (CCPM) Studi Kasus Pembangunan Proyek Irigasi Tahap II Kabupaten Aceh Barat. Jurnal Teknik Industri, 11(3), 204–215. https://doi.org/10.25105/jti.v11i3.13063
Saputra M, D. A., Satria, E., & Pandy, G. A. (2016). Optimalisasi Proses Perakitan Pesawat Tanpa Awak dengan Metoda Critical Path Methods (CPM). Jurnal Optimasi Sistem Industri, 15(1), 87. https://doi.org/10.25077/josi.v15.n1.p87-92.2016
Shofa, M. J., Listiyana, L., & Cahyadi, D. (2018). Usulan Perbaikan Proses Cross Drainage untuk Mempercepat Waktu Proyek Pembangunan Jalan Raya. Jurnal INTECH Teknik Industri Universitas Serang Raya, 4(2), 71–76. https://doi.org/10.30656/intech.v4i2.1054
Steyn, H. (2001). An investigation into the fundamentals of critical chain project scheduling. International Journal of Project Management, 19(6), 363–369. https://doi.org/10.1016/S0263-7863(00)00026-0
Tripiawan, W., & Miranda, S. (2020). Research on a Project Schedule of Factory Renovation for Manufacturing Plants in Bandung. IOP Conference Series: Materials Science and Engineering, 722(1), 12052. https://doi.org/10.1088/1757-899x/722/1/012052
Vidal, L., & Marle, F. (2008). Understanding project complexity: implications on project management. Kybernetes, 37(8), 1094–1110. https://doi.org/10.1108/03684920810884928
Wang, W., Wang, X., Ge, X., & Deng, L. (2014). Multi-objective optimization model for multi-project scheduling on critical chain. Advances in Engineering Software, 68, 33–39. https://doi.org/10.1016/j.advengsoft.2013.11.004
Downloads
Additional Files
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.