Combination of value stream mapping (VSM) method and kanban system to reduce time waste in the production process of making parts for the four-wheel vehicle industry
DOI:
https://doi.org/10.22441/oe.2024.v16.i1.104Kata Kunci:
increase production, kaizen, re-layout, reduce process time, root cause analysisAbstrak
Fulfilling orders from customers in the automotive industry is a necessity that inevitably causes problems that arise in product delivery to customers due to production delays and decreased production yields. The production process often experiences wasted time in the production process of four-wheeled vehicle spare parts. This research aims to reduce production process time, provide solutions to reduce waste and increase the number of four-wheeled vehicle spare parts produced. This research method uses the Lean Manufacturing (LM) approach by combining the Value Stream Mapping (VSM) method with Kanban system improvements, the application of Root Cause Analysis (RCA), and the Kaizen method. This research found that four factors cause waste in process time, including environmental factors, methods, humans, and machines. This research produces the right solution in the relay out of the Assembly and Final Inspection production processes, as well as the use of the e-kanban system in material and product inventory. The research results have reduced the production process time from 17.10 days to 10.05 days, meaning a decrease of 41.22%. This affected production results which increased from an average monthly production of 42,917 pcs to 60,157 pcs, meaning an increase of 128.65%.Unduhan
Referensi
Aisyah, S., Purba, H. H., Jaqin, C., Amelia, Z. R., & Adiyatna, H. (2021). Identification of implementation of Lean, Agile, Resilient, and Green (LARG) approach in Indonesia's automotive industry. Journal Europeen Des Systemes Automatises, 54(2), 317–324. https://doi.org/10.18280/JESA.540214
Aprianto, T., Nuryono, A., Setiawan, I., Kurnia, H., & Purba, H. H. (2022). Waste Analysis in the Speaker Box Assy Process to Reduce Lead Time in the Electronic Musical Instrument Industry. Quality Innovation Prosperity, 26(3), 53–65. https://doi.org/10.12776/qip.v26i3.1744
Ayu, F. T. B. (2018). Rekayasa Perbaikan Proses Produksi Boneka Dengan Integrasi Metode Line Balancing Dan Value Stream Mapping. Operations Excellence: Journal of Applied Industrial Engineering, 10(3), 294. https://doi.org/10.22441/oe.v10.3.2018.009
Castro, S., & Riedel, C. (2017). Assessment of the Implementation of Manufacturing Excellence in a Fiber-Based Packaging Manufacturing Environment. Procedia CIRP, 63, 113–118. https://doi.org/10.1016/j.procir.2017.03.104
Chiarini, A., Baccarani, C., & Mascherpa, V. (2018). Lean production, Toyota Production System and Kaizen philosophy: A conceptual analysis from the perspective of Zen Buddhism. TQM Journal, 30(4), 425–438. https://doi.org/10.1108/TQM-12-2017-0178
Fam, S. F., Ismail, N., Yanto, H., Prastyo, D. D., & Lau, B. P. (2018). Lean manufacturing and overall equipment efficiency (OEE) in paper manufacturing and paper products industry. Journal of Advanced Manufacturing Technology, 12(1 Special Issue 2), 461–474.
Haviana, E., & Hernadewita, H. (2019). Productivity improvement in the rubber production process using the value stream mapping method to eliminate waste. Operations Excellence: Journal of Applied Industrial Engineering, 11(2), 119. https://doi.org/10.22441/oe.v11.2.2019.023
Herdiansyah, D. (2020). Perancangan Dan Penerapan Sistem Kanban Di Pt Xy. Jurnal Ilmiah Teknologi Infomasi Terapan, 6(2), 57–64. https://doi.org/10.33197/jitter.vol6.iss2.2020.330
Hidayat, A. A., Kholil, M., Haekal, J., Ayuni, N. A., & Widodo, T. (2021). Lean Manufacturing Integration in Reducing the Number of Defects in the Finish Grinding Disk Brake with DMAIC and FMEA Methods in the Automotive Sub Industry Company. International Journal Of Scientific Advances, 2(5), 713–718. https://doi.org/10.51542/ijscia.v2i5.7
Ikatrinasari, Z. F., Hasibuan, S., & Kosasih, K. (2018). The Implementation of Lean and Green Manufacturing through Sustainable Value Stream Mapping. IOP Conference Series: Materials Science and Engineering, 453(1), 1–10. https://doi.org/10.1088/1757-899X/453/1/012004
Jaqin, C., Kurnia, H., Purba, H. H., Molle, T. D., & Aisyah, S. (2023). Lean Concept to Reduce Waste of Process Time in the Plastic Injection Industry in Indonesia. Nigerian Journal of Technological Development, 20(2), 73–82. https://doi.org/10.4314/njtd.v18i4.1396
Khan, R. M., & Mushtaq, A. (2022). Material Selection and Manufacturing of Halogen-Based Headlamps for Two-Wheeler Vehicle Technologies. Iranian Journal of Chemistry and Chemical Engineering, 41(1), 88–108. https://doi.org/10.30492/IJCCE.2021.121678.3976
Kurnia, H., Jaqin, C., Purba, H. H., & Setiawan, I. (2021). Implementation of Six Sigma in the DMAIC Approach for Quality Improvement in the Knitting Socks Industry. Tekstilvemuhendis, 28(124), 269–278. https://doi.org/10.7216/1300759920212812403
Kurnia, H., Setiawan, I., & Hernadewita. (2022). Integrasi Lean dan Green Manufacturing Untuk mengurangi Pemborosan Proses dan Limbah Kertas Rekrutmen Karyawan Pada Industri Manufaktur di Indonesia. Jurnal Rekayasa Sistem Industri, 11(2), 145–156. https://doi.org/https://doi.org/10.26593/jrsi.v11i2.5608
Kurniawan, W., Raharto, R., & Muryanto, M. (2022). Implementasi Kanban untuk Meminimalisir Kesalahan Penempatan pada Inventory System. Widya Cipta: Jurnal Sekretari Dan Manajemen, 6(2), 162–167. https://doi.org/10.31294/widyacipta.v6i2.13658
Lemadi, G. (2023). Implementation Of The Kanban System To Improve The Effectiveness Of Production Processes In The Food Industry. Jurnal Baut Dan Manufaktur, 5(1), 31–42.
Martins, B., Silva, C., Silva, D., MacHado, L., Brás, M., Oliveira, R., Carvalho, T., Silva, V., & Lima, R. M. (2021). Implementation of a Pull System Case Study of a Polymeric Production System for the Automotive Industry. Management Systems in Production Engineering, 29(4), 253–259. https://doi.org/10.2478/mspe-2021-0031
Masuti, P. M., & Dabade, U. A. (2019). Lean manufacturing implementation using value stream mapping at the excavator manufacturing company. Materials Today: Proceedings, 19(3), 606–614. https://doi.org/10.1016/j.matpr.2019.07.740
Mirzaei, N., Nejad, M. G., & Fernandes, N. O. (2021). Combining Line Balancing Methods and Discrete Event Simulation: A Case Study from a Metalworking Company. International Journal of Industrial Engineering and Management, 12(1), 14–24. https://doi.org/10.24867/IJIEM-2020-1-273
Nallusamy, S., & Adil Ahamed, M. A. (2017). Implementation of lean tools in an automotive industry for productivity enhancement - A case study. International Journal of Engineering Research in Africa, 29(1), 175–185. https://doi.org/10.4028/JERA.29.175
Pratiwi, A. I., & Santosa, R. Y. (2019). Improvement proses picking delivery pada perusahaan jasa warehouse dan logistik dengan pendekatan sistem kanban. 1st Conference on Industrial Engineering and Halal Industries (CIEHIS), 1(1), 169–176.
Purba, H. H., Mukhlisin, & Aisyah, S. (2018). Productivity improvement picking order by an appropriate method, value stream mapping analysis, and storage design: A case study in the automotive part center. Management and Production Engineering Review, 9(1), 71–81. https://doi.org/10.24425/119402
Rifqi, H., Zamma, A., Souda, S. B., & Hansali, M. (2021). Lean manufacturing implementation through DMAIC approach: A case study in the automotive industry. Quality Innovation Prosperity, 25(2), 54–77. https://doi.org/10.12776/qip.v25i2.1576
Romeira, B., Cunha, F., & Moura, A. (2021). Development and Application of an e-Kanban System in the Automotive Industry. International Conference on Industrial Engineering and Operations Management, 613–624. http://ieomsociety.org/proceedings/2021monterrey/101.pdf
Rose, A. N. M., Mohamed, N. M. Z. N., Ab Rashid, M. F. F., Noor, H. M., & Mohd, A. (2020). Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company. Journal of Physics: Conference Series, 1532(1). https://doi.org/10.1088/1742-6596/1532/1/012005
Salvador, R., Piekarski, C. M., & Francisco, A. C. de. (2017). Approach of the Two-way Influence Between Lean and Green Manufacturing and its Connection to Related Organisational Areas. International Journal of Production Management and Engineering, 5(2), 73. https://doi.org/10.4995/ijpme.2017.7013
Santosa, W. A., & Sugarindra, M. (2018). Implementation of lean manufacturing to reduce waste in the production line with value stream mapping approach and Kaizen in division sanding upright piano, a case study in PT. X. MATEC Web of Conferences, 154, 8–11. https://doi.org/10.1051/matecconf/201815401095
Setiawan, B., Setiawan, I., Kurnia, H., Wahid, M., & Purba, H. H. (2022). Implementasi Metode Value Stream Mapping Pada Industri: Tinjauan Literatur Sistematis. Inaque : Journal of Industrial and Quality Engineering, 10(2), 103–116. https://doi.org/10.34010/iqe.v10i2.5989
Setiawan, S., Setiawan, I., Jaqin, C., Prabowo, H. A., & Purba, H. H. (2021). Integration of Waste Assessment Model and Lean Automation to Improve Process Cycle Efficiency in the Automotive Industry. Quality Innovation Prosperity, 25(3), 48–64. https://doi.org/10.12776/qip.v25i3.1613
Singh, J., Singh, H., Singh, A., & Singh, J. (2020). Managing industrial operations by lean thinking using value stream mapping and Six Sigma in manufacturing unit: Case studies. In Management Decision (Vol. 58, Issue 6). https://doi.org/10.1108/MD-04-2017-0332
Sjarifudin, D., & Kurnia, H. (2022). The PDCA Approach with Seven Quality Tools for Quality Improvement Men's Formal Jackets in Indonesia Garment Industry. Jurnal Sistem Teknik Industri (JSTI), 24(2), 159–176. https://doi.org/10.32734/jsti.v24i2.7711
Sjarifudin, D., Kurnia, H., Purba, H. H., & Jaqin, C. (2022). Implementation of the Six Sigma approach for increasing the quality of formal men’s jackets in the garment industry. Jurnal Sistem Dan Manajemen Industri, 6(1), 33–44. https://doi.org/10.30656/jsmi.v6i1.4359
Sumanto, S., & Marita, L. S. (2017). Penerapan Sistem Just In Time Persediaan Di Produksi Studi Kasus : PT. Nitto Materials Indonesia. J I M P - Jurnal Informatika Merdeka Pasuruan, 2(3), 1–11. https://doi.org/10.37438/jimp.v2i3.75
Tannady, H., Gunawan, E., Nurprihatin, F., & Wilujeng, F. R. (2019). Process improvement to reduce waste in the biggest instant noodle manufacturing company in Southeast Asia. Journal of Applied Engineering Science, 17(2), 203–212. https://doi.org/10.5937/jaes17-18951
W Creswell, J. (2014). Research-Design_Qualitative-Quantitative-and-Mixed-Methods-Approaches Forth Edition. In V. Knight (Ed.), Sage Publication (Fourth Edi). Sage Publication Ltd.
Wang, C. C., Chien, C. H., & Trappey, A. J. C. (2021). On the application of ARIMA and LSTM to predict order demand based on short lead time and on-time delivery requirements. Processes, 9(7), 1–19. https://doi.org/10.3390/pr9071157
Wiyatno, T. N., & Kurnia, H. (2022). Increasing Overall Equipment Effectiveness in the Computer Numerical Control Lathe Machines Using the Total Productive Maintenance Approach. Jurnal Optimasi Sistem Industri, 15(2), 284–292. https://doi.org/10.31315/opsi.v15i1.7284
Unduhan
File Tambahan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.