Application of lean manufacturing in reducing cycle time in the cylinder head component at PT TM
DOI:
https://doi.org/10.22441/oe.2025.v17.i2.148Keywords:
Cycle Time, Kaizen, Lean Manufacturing, Production Efficiency, WasteAbstract
The manufacturing industry continues to grow with intense competition, so companies need to improve efficiency and reduce waste in the production process. Lean Manufacturing with Kaizen approach is one of the effective methods to optimize workflow and reduce waste. PT TM faces problems in the production process, especially in the post 2 packing component cylinder head, where there are cycle time fluctuations that have an impact on production efficiency. To overcome these problems, the Lean Manufacturing method with Kaizen approach is applied to reduce waste and improve production efficiency. This study aims to analyze the effect of Kaizen implementation in reducing cycle time and identifying waste that occurs in the production process. The methods used include direct observation in the production line, data collection and analysis, and implementation of Kaizen-based improvements. The results showed that the implementation of Kaizen succeeded in reducing cycle time from 97 seconds to 80 seconds, with a takt time of 105 seconds. In addition, two types of waste were found, namely waiting for 25 seconds and motion for 6 seconds, which have been minimized through changes in layout and work procedures. The conclusion of this study is that the Kaizen method is effective in improving production time efficiency and reducing waste.Downloads
References
Aisyah, S. (2020). Perencanaan Lean Manufacturing Untuk Mengurangi Pemborosan Menggunakan Metode VSM Pada PT Y Indonesia. Jurnal Optimasi Teknik Industri (JOTI), 2(2), 56–59.
Anjani, R., & Pratiwi, I. I. (2022). Implementasi Lean Manufacturing Untuk Meminimalkan Waste Pada Proses Produksi Batu Bata Menggunakan Value Stream Mapping (Vsm) Dan Waste Assessment Model (Wam). Universitas Muhammadiyah Surakarta.
Deming, W. E. (2018). The new economics for industry, government, education. MIT press.
Fatma, N. F., Ponda, H., & Sutisna, E. (2022). Penerapan lean manufacturing dengan metode Value Stream Mapping untuk mengurangi waste pada proses pengecekan material bahan baku ke lini produksi. Journal Industrial Manufacturing, 7(1), 41–54.
Irawan, A., & Putra, B. I. (2021). Identifikasi Waste Kritis Pada Proses Produksi Pallet Plastik Menggunakan Metode WAM (Waste Assessment Model) Di PT. XYZ. Jurnal SENOPATI: Sustainability, Ergonomics, Optimization, and Application of Industrial Engineering, 3(1), 20–29.
Johan, A., & Soediantono, D. (2022). Literature review of the benefits of lean manufacturing on industrial performance and proposed applications in the defense industries. Journal of Industrial Engineering & Management Research, 3(2), 13–23.
Khunaifi, A., Primadasa, R., & Sutono, S. B. (2022). Implementasi Lean Manufacturing untuk Meminimasi Pemborosan (Waste) Menggunakan Metode Value Stream Mapping di PT. Pura Barutama. Jurnal Rekayasa Industri (JRI), 4(2), 87–93.
Komariah, I. (2022). Penerapan lean manufacturing untuk mengidentifikasi pemborosan (waste) pada produksi wajan menggunakan value stream mapping (vsm) pada perusahaan primajaya alumunium industri di ciamis. Jurnal Media Teknologi, 8(2), 109–118.
Kumar, N., Hasan, S. S., Srivastava, K., Akhtar, R., Yadav, R. K., & Choubey, V. K. (2022). Lean manufacturing techniques and its implementation: A review. Materials Today: Proceedings, 64, 1188–1192.
Larasati, P. D., & Laksono, P. W. (2022). Implementasi Lean Manufacturing untuk Mempersingkat Lead Time di PT XYZ dengan Metode Value Stream Mapping. Seminar Dan Konferensi Nasional IDEC, 23.
Nurwulan, N. R., Taghsya, A. A., Astuti, E. D., Fitri, R. A., & Nisa, S. R. K. (2021). Pengurangan Lead Time dengan Lean Manufacturing: Kajian Literatur Lead Time Reduction using Lean Manufacturing: A Review. JIME (Journal of Industrial and Manufacture Engineering), 5(1), 30–40.
Pattiapon, M. L., Maitimu, N. E., & Magdalena, I. (2020). Penerapan Lean Manufacturing guna Meminimasi Waste pada Lantai Produksi. Arika, 14(1), 23–36.
Permana, N., & Pujani, V. (2020). Penerapan Lean Manufacturing Untuk Mengurangi Waste Pada Proses Produksi (Tiang Post) Produk Guardrail Di Pt. Xxx. Jurnal Ilmu Manajemen Dan Akuntansi Terapan (JIMAT), 11(1), 81–99.
Pratama, R. A., & Al Faritsy, A. Z. (2024). Optimalisasi Proses Produksi Briket dengan Metode Lean Manufacturing:(Studi Kasus: CV Harico). Jurnal Teknologi Dan Manajemen Industri Terapan, 3(2), 220–229.
Sembiring, A. P. (2018). Karakteristik Campuran Beraspal Jenis Asphalt Concrete Binder Coarse menggunakan Batu Gunung Sinabung dengan Pengujian Marshall berdasarkan Spesifikasi Bina Marga 2010 Revisi 3.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









