[1]
Riadi, S. et al. 2019. Menurunkan angka rework pada proses burritori di line injection moulding dengan metode PDCA. Operations Excellence: Journal of Applied Industrial Engineering. 11, 2 (Aug. 2019), 202–216. DOI:https://doi.org/10.22441/oe.v11.2.2019.030.