[1]
Putra, E.S. 2019. Peningkatan produktifitas proses perakitan material ban motor dengan metode 8 step quality control circle di Divisi Assembly Building Tire. Operations Excellence: Journal of Applied Industrial Engineering. 11, 3 (Dec. 2019), 288–299. DOI:https://doi.org/10.22441/oe.v11.3.2019.037.