Hia, S. W. and Pramudjito, P. A. D. (2024) “Reduce mean time to repair of mining equipment with lean six sigma”, Operations Excellence: Journal of Applied Industrial Engineering. Jakarta, Indonesia, 16(3), pp. 331–340. doi: 10.22441/oe.2024.v16.i3.125.