Putra, E. S. (2019) “Peningkatan produktifitas proses perakitan material ban motor dengan metode 8 step quality control circle di Divisi Assembly Building Tire”, Operations Excellence: Journal of Applied Industrial Engineering. Jakarta, Indonesia, 11(3), pp. 288–299. doi: 10.22441/oe.v11.3.2019.037.