A Capacity Planning through Discrete Event Simulation
DOI:
https://doi.org/10.22441/pasti.2020.v14i2.005Keywords:
capacity planning, discrete-event simulation, in-plant truck movement, shifting bottleneck, critical resourcesAbstract
The capacity planning serves an important role in strategic decisions involving production facilities. While there are many publications made on capacity planning, most of the models created tend to restrict their applications in real-world due to some initial assumptions being made and/or the run-time execution of the models that may be prohibitive. The objective of this paper is to explore the model construction for in-plant truck movement in a cement company that is based on building a discrete-event simulation one so that the planning may be sufficiently robust while the amount of time for constructing the model and the run-time still serve practical purposes. The model then is used to examine the effects of shifting bottlenecking and thus, allows users to identify critical resources for the production process. The results show that such a model provides the directions and aids for the management to make the strategic decisions.
Downloads
References
Ahmed, S., & Sahinidis, N. (2003). An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion. Operations Research, 51(3), 461-471.
Ahmed, S., King, A., & Parija, G. (2003). A Multi-stage Stochastic Integer Programming Approach for Capacity Expansion Under Uncertainty. Journal of Global Optimization, 26, 3-24.
Asbach, L., Dorndorf, U., & Pesch, E. (2009). Analysis, modeling and solution of the concrete delivery problem. European Journal of Operational Research, 193(3), 820-835.
Banks, J., Carson, J. S., Nelson, B. L., & Nicol, D. M. (2013). Discrete-Event System Simulation. New York: Pearson.
Biller, B., Hartig, M., Olson, R. J., Trant, G., Sui, Y., & Minnick, A. (2019). General Electric Uses Simulation and Risk Analysis for Silicon Carbide Production System Design. INFORMS Journal on Applied Analytics, 49(2), 117-128.
Bodon, P., Fricke, C., Sandeman, T., & Stanford, C. (2011). Modeling the mining supply chain from mine to port: A combined optimization and simulation approach. Journal of Mining Science, 47(2), 202-211.
Bouffard, S. C., Boggis, P., Pereira, M., Quan, K., & Fleming, S. (2018). Discrete-event simulation modeling unlocks value for the Jansen Potash Project. INFORMS Journal on Applied Analytics, 48(1), 45-56.
Brown, G., Keegan, J., Vigus, B., & Wood, K. (2001). The Kellogg Company optimizes production, inventory, and distribution. Interfaces, 31(6), 1-15.
Cakanyildirim, M., Roundy, R., & Wood, S. (2004). Optimal Machine Capacity Expansions with Nested Limitations Stochastic Demand Forecast Accuracy Model. Naval Research Logistics, 51, 217-241.
Chen, J., Chen, L., & Leu, D. (2006). Developing optimization models for cross-functional decision making: Integrating marketing and production planning. OR Spectrum, 28(2), 223-240.
Chou, Y.-C., Cheng, C.-T., Yang, F.-C., & Liang, Y.-Y. (2007). Evauating Alternative Capacity Strategies in Semiconductor Manufacturing under Uncertain Demand and Price Scenarios. International Journal of Production Economics, 105(2), 591-606.
Dikos, G., & Spyropoulou, S. (2013). Supply chain optimization and planning in Heracles general cement company. Interfaces, 43(4), 297-312.
Everett, J. E., Howard, T. J., & Jupp, K. (2010). Simulation modelling of grade variability for iron ore mining, crushing, stockpiling and ship loading operations. Mining Technology, 119(1), 22-30.
Fowler, J. W., Monch, L., & Ponsigmon, T. (2015). Discrete-event simulation for semiconductor wafer fabrication facilities: A tutorial. International Journal of Industrial Engineering Theory & Practice, 22(5), 661-682.
Geng, N., & Jiang, Z. (2009). A Review on Strategic Capacity Planning for the Semiconductor Manufacturing Industry. International Journal of Production Research, 47(13), 3639-3655.
Groeneveld, B., & Topal, E. (2011). Flexible open-pit mine design under uncertainty. Journal of Mining Science, 47(2), 212-226.
Hammesfahr, R. J., Pope, J. A., & Ardalan, A. (1993). Strategic Planning for Production Capacity. International Journal of Operations & Production Management, 13(5).
Hoffman, K., & Durbin, M. (2008). The dance of the thirty ton trucks. Operations Research, 56(1), 3-19.
March, J. G., & Simon, H. A. (1958). Organizations. New York: John Wiley.
Matsatsinis, N. F. (2004). Towards a decision support system for the ready concrete distribution system: A case of a Greek company. European Journal of Operational Research, 152(2), 487-499.
Meng, C., Nageshwaraniyer, S. S., Maghsoudi, A., & Dessureault, S. (2013). Data-driven modelling and simulation framework for material handling systems in coal mines. Computers & Industrial Engineering, 64(3), 766-779.
Mutagwaba, W. K., & Hudson, J. A. (1993). Use of object-orientated simulation model to assess operating and equipment options for underground mine transport system. Mining Technology IMM Transportation Section A, 102, 89-94.
Naso, D., Suricom, M., & Turchiano, B. (2007). Reactive scheduling of a distributed network for the supply of perishable products. IEEE Transactions on Automation Science and Engineering, 4(3), 407-423.
Pereira, S. P., Costa, J. F., Salvadoretti, P., & Koppe, J. (2012). Mining simulation for room and pillar coal operation. Journal of Southern African Institute of MIning Metallurgy, 112(6), 473-476.
Sabour, S. A., Dimitrakopoulos, R. G., & Kumral, M. (2013). Mine design selection under uncertainty. Mining Technology, 117(2), 53-66.
Salama, A., Greberg, J., & Schunnesson, H. (2014). The use of discrete event simulation for underground haulage mining equipment selection. International Journal of Mining Mineral Engineering, 5(3), 256-271.
Sargent, R. G. (2007). Verification and Validation of Simulation Models. In S. G. Henderson, B. Biller, M. H. Hsieh, J. Shortle, J. D. Tew, & R. R. Barton (Ed.), Proceedings of the 2007 Winter Simulation Conference, (pp. 124-137). Washington, D.C.
Schmid, V., Doerner, K. F., Hartl, R. F., Savelsbergh, M. W., & Stoecher, W. (2009). A hybrid solution approach for ready-mixed concrete delivery. Transportation Science, 43(1), 70-85.
Tenhiala, A. (2011, 1-2). Contingency Theory of Capacity Planning: The Link between Process Types and Planning Methods. Journal of Operations Management, 29, 65-77. doi:10.1016/j.jom.2010.05.003
Tommelein, I. D., & Li, A. (1999). Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration. Proceeding of Seventh Annual Conference (pp. 97-108). University of California, Berkeley: International Group for Lean Construction IGLC-7.
Woods, S. C. (2007). Factory modeling. In R. Doering, & Y. Nishi (Eds.), Handbook of Semiconductor Manufacturing Technology (pp. 1-23). Boca Raton, FL: CRC Press.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.