A Systematic Review of Kaizen Approach in Industries
DOI:
https://doi.org/10.22441/ijiem.v3i2.14131Keywords:
Kaizen, PDCA, TQM, QMS, JITAbstract
Today industries are currently entering the best possibility to action on rapidly changing customer needs, desires and experiences. In the environment of industries, as well as cultural competitiveness and improving market share in the global narrowing market saturation is a big concern, the concept of continuous improvement of manufacturing processes strive to the best experiences to customers has become necessary. Market competition and continuously increasing levels of service and needs for customer satisfaction have proven to be the ultimate driver of an organization's key performance continuous improvement. Adaptable Kaizen refers to sustainable continuous improvement in performance delivery, cost, and quality to a satisfied customer. This paper contribution to define research variable domination in various tools used in Kaizen concept and research variable of Kaizen dominated by VSM and Continuous Improvement with the same percentage number 21%, then Lean 18%, TPM 10%, 5S 8%, PDCA 4%, in this calculation one research paper can use more than one tools of Kaizen.Downloads
References
Agmoni, E. (2015). The role of Kaizen in creating radical performance results in a logistics service provider. The Role of Kaizen in Creating Radical Performance Results in a Logistics Service Provider, 12(3), 225–245. https://doi.org/10.17270/J.LOG.2016.3.4
Al-Aomar, R., & Hussain, M. (2019). Exploration and prioritization of lean techniques in a hotel supply chain. International Journal of Lean Six Sigma, 10(1), 375–396. https://doi.org/10.1108/IJLSS-10-2017-0119
Awad, M., & Shanshal, Y. A. (2017). Utilizing Kaizen process and DFSS methodology for new product development. International Journal of Quality and Reliability Management, 34(3), 378–394. https://doi.org/10.1108/IJQRM-09-2014-0139
Bortolotti, T., Boscari, S., Danese, P., Medina Suni, H. A., Rich, N., & Romano, P. (2018). The social benefits of kaizen initiatives in healthcare: an empirical study. International Journal of Operations and Production Management, 38(2), 554–578. https://doi.org/10.1108/IJOPM-02-2017-0085
Campos, V. M. K., Cotrim, S. L., Galdamez, E. V. C., & Leal, G. C. L. (2016). Introduction of Lean Manufacturing Philosophy By Kaizen Event: Case Study on a Metalmechanical Industry. Independent Journal of Management & Production, 7(1), 151–168. https://doi.org/10.14807/ijmp.v7i1.388
Chan, C. O., & Tay, H. L. (2018). Combining lean tools application in kaizen: a field study on the printing industry. International Journal of Productivity and Performance Management, 67(1), 45–65. https://doi.org/10.1108/IJPPM-09-2016-0197
Chowdhury, A. H., Shahriar, S., Hossen, T., & Mahmud, P. (2016). Reduction of Process Lead Time Using Lean Tool - Value Stream Mapping (VSM). Applied Mechanics and Materials, 860, 74–80. https://doi.org/10.4028/www.scientific.net/amm.860.74
Crema, M., Verbano, C., & Chiozza, M. L. (2015). First evidences from “lean & safety” projects. International Journal of Quality and Service Sciences, 7(2–3), 245–259. https://doi.org/10.1108/IJQSS-03-2015-0031
Dadashnejad, A. A., & Valmohammadi, C. (2018). Investigating the effect of value stream mapping on operational losses: a case study. Journal of Engineering, Design and Technology, 16(3), 478–500. https://doi.org/10.1108/JEDT-11-2017-0123
Dakhli, Z., Lafhaj, Z., & Bernard, M. (2017). Application of lean to the bidding phase in building construction: A French contractor’s experience. International Journal of Lean Six Sigma, 8(2), 153–180. https://doi.org/10.1108/IJLSS-03-2016-0010
Dave, Y., & Sohani, N. (2015). Solving the Issue of Electronic Breakdown of Hobbing Machine through Kobetsu Kaizen Methodology: A Case Study. Applied Mechanics and Materials, 789–790, 592–596. https://doi.org/10.4028/www.scientific.net/amm.789-790.592
de Almeida, J. P. L., Galina, S. V. R., Grande, M. M., & Brum, D. G. (2017). Lean thinking: planning and implementation in the public sector. International Journal of Lean Six Sigma, 8(4), 390–410. https://doi.org/10.1108/IJLSS-06-2016-0027
Džubáková, M., & Kopták, M. (2017). Work standardisation in logistics processes. Quality Innovation Prosperity, 21(2), 109–123. https://doi.org/10.12776/qip.v21i2.880
Elsheikh, A. M., Emam, M. S., & AlShareef, S. A. (2017). Bridging the gap between documents and practice in medication management “Documents Vitalization.” Business Process Management Journal, 23(4), 830–841. https://doi.org/10.1108/BPMJ-02-2017-0030
Goni, J. I. C., Tharia, F., & Suryo, N. (2018). An empirical study on relationships amongst success in benchmarking, success in Kaizen, people mindset and organizational dimensions. Benchmarking, 25(9), 3505–3518. https://doi.org/10.1108/BIJ-04-2017-0080
Gonzalez Aleu, F., & Van Aken, E. M. (2016). Systematic literature review of critical success factors for continuous improvement projects. International Journal of Lean Six Sigma, 7(3), 214–232. https://doi.org/10.1108/IJLSS-06-2015-0025
Gumba, H., Waichungo, J., Lowe, B., Mwanzu, A., Musyimi, R., Thitiri, J., … Kariuki, S. (2019). Implementing a quality management system using good clinical laboratory practice guidelines at KEMRI-CMR to support medical research. Wellcome Open Research, 3, 1–14. https://doi.org/10.12688/wellcomeopenres.14860.2
Gunduz, M., & Naser, A. F. (2017). Cost based Value Stream Mapping as a sustainable construction tool for undergraound pipeline construction projects. Sustainability (Switzerland), 9(12). https://doi.org/10.3390/su9122184
Ihsan, M., Hasanah, R., & Purba, H. H. (2019). Fanuc CNC machine damage analysis using the PDCA cycle and Kaizen implementation effort in increasing skill up operator performance in PT YPMI. Independent Journal of Management & Production, 10(1), 259. https://doi.org/10.14807/ijmp.v10i1.590
Jasti, N. V. K., Kota, S., & Sangwan, K. S. (2020). An application of value stream mapping in auto-ancillary industry: a case study. TQM Journal, 32(1), 162–182. https://doi.org/10.1108/TQM-11-2018-0165
Jayakrishna, K., Srikrishna, M., Senthilkumar, S., Vinoth Louie, A., & Kamalakannan, R. (2017). Development of Environmental Value Stream Model for Assessing Sustainability in Manufacturing. Applied Mechanics and Materials, 867, 301–306. https://doi.org/10.4028/www.scientific.net/amm.867.301
Kim, S. K. (2015). Lean initiative practice for supplier developments in Philippines. International Journal of Lean Six Sigma, 6(4), 349–368. https://doi.org/10.1108/IJLSS-12-2014-0042
Kumar, S., Dhingra, A., & Singh, B. (2018). Lean-Kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), 143–160. https://doi.org/10.1108/JEDT-08-2017-0083
Ma, J., Lin, Z., & Lau, C. K. (2017). Prioritising the enablers for the successful implementation of Kaizen in China. International Journal of Quality & Reliability Management, 34(4), 549–568. https://doi.org/10.1108/ijqrm-12-2015-0173
Matusova, D. (2016). the Improvement of Logistics Processes Through Kaizen and Six Sigma. The International Journal of Transport & Logistics, 16, 1–6. Retrieved from https://search.proquest.com/docview/1848505370?accountid=26636%0Ahttp://link.periodicos.capes.gov.br/sfxlcl41?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Amaterialscienceengineering&atitle=THE+IMPROVEMENT+OF+L
Musa, M. A., Kasim, N. I., Razali, A. R., Mahadzir, & Wan Saidin, W. A. N. (2015). Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line. Applied Mechanics and Materials, 761, 165–169. https://doi.org/10.4028/www.scientific.net/amm.761.165
Naidoo, L., & Mahomed, O. H. (2016). Impact of Lean on patient cycle and waiting times at a rural district hospital in KwaZulu-Natal. African Journal of Primary Health Care & Family Medicine, 8(1), e1–e9. https://doi.org/10.4102/phcfm.v8i1.1084
Nguyen, T. L. (2019). STEAM-ME: A Novel Model for Successful Kaizen Implementation and Sustainable Performance of SMEs in Vietnam. Complexity, 2019. https://doi.org/10.1155/2019/6048195
Omotayo, T. S., Boateng, P., Osobajo, O., Oke, A., & Obi, L. I. (2020). Systems thinking and CMM for continuous improvement in the construction industry. International Journal of Productivity and Performance Management, 69(2), 271–296. https://doi.org/10.1108/IJPPM-11-2018-0417
Posteucă, A., & Zapciu, M. (2015). Beyond Target Costing: Manufacturing Cost Policy Deployment for New Products. Applied Mechanics and Materials, 809–810, 1480–1485. https://doi.org/10.4028/www.scientific.net/amm.809-810.1480
Prawira, A. Y., Rahayu, Y., Hamsal, M., & Purba, H. H. (2018). A Case Study: How 5S Implementation Improves Productivity of Heavy Equipment in Mining Industry. Independent Journal of Management & Production, 9(4), 1184. https://doi.org/10.14807/ijmp.v9i4.826
Randhawa, J. S., & Ahuja, I. S. (2017a). 5S – a quality improvement tool for sustainable performance: literature review and directions. International Journal of Quality and Reliability Management, 34(3), 334–361. https://doi.org/10.1108/IJQRM-03-2015-0045
Randhawa, J. S., & Ahuja, I. S. (2017b). Evaluating impact of 5S implementation on business performance. International Journal of Productivity and Performance Management, 66(7), 948–978. https://doi.org/10.1108/IJPPM-08-2016-0154
Randhawa, J. S., & Ahuja, I. S. (2018). An investigation into manufacturing performance achievements accrued by Indian manufacturing organization through strategic 5S practices. International Journal of Productivity and Performance Management, 67(4), 754–787. https://doi.org/10.1108/IJPPM-06-2017-0149
Rodrigues, J., de Sá, J. C. V., Ferreira, L. P., Silva, F. J. G., & Santos, G. (2019). Lean management “quick-wins”: Results of implementation. A case study. Quality Innovation Prosperity, 23(3), 3–21. https://doi.org/10.12776/QIP.V23I3.1291
Sánchez-Ruiz, L., Blanco, B., & Gómez-López, R. (2019). Continuous improvement enablers: Defining a new construct. Journal of Industrial Engineering and Management, 12(1), 51–69. https://doi.org/10.3926/jiem.2743
Saravanan, V., Nallusamy, S., & George, A. (2018). Efficiency Enhancement in a Medium Scale Gearbox Manufacturing Company through Different Lean Tools - A Case Study. International Journal of Engineering Research in Africa, 34, 128–138. https://doi.org/10.4028/www.scientific.net/JERA.34.128
Satolo, E. G., Leite, C., Calado, R. D., Goes, G. A., & Salgado, D. D. (2018). Ranking lean tools for world class reach through grey relational analysis. Grey Systems: Theory and Application, 8(4), 399–423. https://doi.org/10.1108/gs-06-2018-0031
Shah, S. R., & Naghi Ganji, E. (2017). Lean production and supply chain innovation in baked foods supplier to improve performance. British Food Journal, 119(11), 2421–2447. https://doi.org/10.1108/BFJ-03-2017-0122
Singh, K., & Ahuja, I. S. (2015). An evaluation of transfusion of TQM-TPM implementation initiative in an Indian manufacturing industry. Journal of Quality in Maintenance Engineering, 21(2), 134–153. https://doi.org/10.1108/JQME-04-2013-0017
Sraun, J. S., & Singh, H. (2017). Continuous improvement strategies across manufacturing SMEs of Northern India. International Journal of Lean Six Sigma, 8(2), 225–243. https://doi.org/10.1108/ijlss-05-2016-0019
Stelson, P., Hille, J., Eseonu, C., & Doolen, T. (2017). What drives continuous improvement project success in healthcare? International Journal of Health Care Quality Assurance, 30(1), 43–57. https://doi.org/10.1108/IJHCQA-03-2016-0035
Suhardi, B., Anisa, N., & Laksono, P. W. (2019). Minimizing waste using lean manufacturing and ECRS principle in Indonesian furniture industry. Cogent Engineering, 6(1), 1–13. https://doi.org/10.1080/23311916.2019.1567019
Tan, J. J. Y., Otto, K. N., & Wood, K. L. (2017). Relative impact of early versus late design decisions in systems development. Design Science, 3, 1–28. https://doi.org/10.1017/dsj.2017.13
Thomas, A. (2018). Developing an integrated quality network for lean operations systems. Business Process Management Journal, 24(6), 1367–1380. https://doi.org/10.1108/BPMJ-02-2018-0041
Vinodh, S., Selvaraj, T., Chintha, S. K., & Vimal, K. E. K. (2015). Development of value stream map for an indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), 380–399. https://doi.org/10.1108/JEDT-08-2010-0054
Wickramasinghe, G. L. D., & Wickramasinghe, V. (2016). Effects of continuous improvement on shop-floor employees’ job performance in Lean production: The role of Lean duration. Research Journal of Textile and Apparel, 20(4), 182–194. https://doi.org/10.1108/RJTA-07-2016-0014
Xavier, A., & Gonzalez, M. D. M. (2016). Analysis and improvement of production efficiency in a construction machine assembly line. Independent Journal of Management & Production, 7(5), 606. https://doi.org/10.14807/ijmp.v7i5.453
Zarbo, R. J., Varney, R. C., Copeland, J. R., D’Angelo, R., & Sharma, G. (2015). Daily management system of the Henry Ford production system: QTIPS to Focus Continuous Improvements at the Level of the Work. American Journal of Clinical Pathology, 144(1), 122–136. https://doi.org/10.1309/AJCPLQYMOFWU31CK
Zeferino, E. B. B., Sarantopoulos, A., Spagnol, G. S., Min, L. L., & Freitas, M. I. P. de. (2019). Value Flow Map: application and results in the disinfection center. Revista Brasileira de Enfermagem, 72(1), 140–146. https://doi.org/10.1590/0034-7167-2018-0517
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









