Relayout of Palm Coconut Factories in West Sumatera

Authors

  • Demi Ramadian Politeknik ATI Padang
  • Tosty Maylangi Sitorus Politeknik ATI Padang

DOI:

https://doi.org/10.22441/ijiem.v4i2.19542

Keywords:

Palm Oil Factories, Activity Relationship Chart, Relayout, West Sumatera

Abstract

One of the plantation companies and palm oil mills in West Sumatera is part of the group and makes a positive contribution. In one of the palm oil factories in West Sumatra, there is a problem with the flow of the work process, where there is an accumulation of products of different sizes in the factory area. This hinders the product transfer process. In addition, this situation will affect the use of the land area. Therefore, it is necessary to consider how to make or change the layout of facilities more effectively and efficiently. An activity Relationship Chart will be used as a method to make recommendations for the layout design of palm coconut factories. The flow of the crude palm oil production process from the proposed layout design weighs the car and bunches of fresh fruits before heading to isolation until the bunches of ripe fruits are stored in the storage tank before being transferred to the transport car. Based on the proposed layout redesign, the management of the oil palm mill can consider improving the placement of the area in the boiler station, as well as the placement of production not too far from the production process.

Downloads

Download data is not yet available.

References

Al-Zubaidi, S. Q. D., Fantoni, G., & Failli, F. (2021). Analysis of drivers for solving facility layout problems: A Literature review. Journal of Industrial Information Integration, 21, 100187. https://doi.org/10.1016/j.jii.2020.100187

Arif, M. (2017). Perancangan Tata Letak Pabrik. Deepublish.

CHAERUL, A., ARIANTO, B., & BHIRAWA, W. T. (2021). Perancangan Ulang Tata Letak Fasilitas Di Cafe “Home 232” Cinere. Jurnal Teknik Industri, 8(2). https://doi.org/10.35968/jtin.v8i2.799

Durmusoglu, Z. D. (2018). A TOPSIS-based approach for sustainable layout design: activity relation chart evaluation. Kybernetes. https://doi.org/10.1108/K-02-2018-0056

Faishal, M., & Pratama, M. A. (2019). Perancangan ulang tata letak fasilitas perusahaan sandal hotel dengan metode ARC untuk mengurangi waste. Jurnal Teknologi, 12(2), 116-122.

Jamalludin, J., & Ramadhan, H. (2020). Metode Activity Relationship Chart (Arc) Untuk Analisis Perancangan Tata Letak Fasilitas Pada Bengkel Nusantara Depok. Bulletin of Applied Industrial Engineering Theory, 1(2)

Jaya, J. D., Nuryati, N., & Audinawati, S. A. N. (2017). Perancangan ulang tata letak fasilitas produksi UD. usaha berkah berdasarkan activity relationship chart (ARC) dengan aplikasi Blocplan-90. Jurnal Teknologi Agro-Industri, 4(2), 111-122. https://doi.org/10.34128/jtai.v4i2.56

Kramanandita, R. (2019). Praktek-Praktek Operasi Pabrik Berbasis Pembangunan Berkelanjutan Pada Industri Pengolahan Kelapa Sawit. Jurnal Ilmiah Teknologi Industri, 1(2).

Monga, R., & Khurana, V. (2015). Facility layout planning: a review. International Journal of Innovative Research in Science, Engineering and Technology, 4(3), 2347-6710. : https://doi.org/10.15680/IJIRSET.2015.0403027

Pramesti, M., Subagyo, H. S. H., & Aprilia, A. (2019). Perencanaan Ulang Tata Letak Fasilitas Produksi Keripik Nangka Dan Usulan Keselamatan Kesehatan Kerja (Studi Kasus Di Umkm Duta Fruit Chips, Kabupaten Malang). Agrisocionomics: Jurnal Sosial Ekonomi Pertanian, 3(2), 150-164. https://doi.org/10.14710/agrisocionomics.v3i2.5297

Pratiwi, I., Muslimah, E., & Aqil, A. W. (2012). Perancangan tata letak fasilitas di industri tahu menggunakan blocplan.

Ramadhan, D., Widodo, L., Gozali, L., Sukania, I. W., Daywin, F. J., & Doaly, C. O. (2020). Redesigning The Facility Layout With Systematic Layout Planning Method and Lean Manufacturing Approach On The Production Floor At PT. Baruna Trayindo Jaya.

Rosyidi, M. R. (2018). Analisa tata letak fasilitas produksi dengan metode ARC, ARD, dan AAD di PT. XYZ. WAKTU: Jurnal Teknik UNIPA, 16(1), 82-95. https://doi.org/10.36456/waktu.v16i1.1493

Safitri, N. D., Ilmi, Z., & Kadafi, M. A. (2017). Analisis perancangan tataletak fasilitas produksi menggunakan metode activity relationship chart (ARC). Jurnal Manajemen, 9(1), 38-47. https://doi.org/10.30872/jmmn.v9i1.2431

Suhardi, B., Juwita, E., & Astuti, R. D. (2019). Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach. Cogent Engineering, 6(1), 1597412. https://doi.org/10.1080/23311916.2019.1597412

Suminar, L. A., Wahyudin, W., & Nugraha, B. (2020). Analisis Perancangan Tata Letak Pabrik PT. Xyz Dengan Metode Activity Relationship Chart (ARC). J. Sains dan Teknol. J. Keilmuan dan Apl. Teknol. Ind, 20(2), 181

Yulistio, A., Basuki, M., & Azhari, A. (2022). Perancangan Ulang Tata Letak Display Retail Fashion Menggunakan Activity Relationship Chart (ARC). Jurnal Ilmiah Teknik Industri, 10(1), 21-30. https://doi.org/10.24912/jitiuntar.v10i1.9388

Downloads

Published

2023-06-30

How to Cite

1.
Ramadian D, Sitorus TM. Relayout of Palm Coconut Factories in West Sumatera. IJIEM [Internet]. 2023 Jun. 30 [cited 2026 May 29];4(2):125-32. Available from: https://training-ojs3-publikasi.mercubuana.ac.id/index.php/ijiem/article/view/19542

Issue

Section

Articles

Similar Articles

<< < 1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.