Inventory Planning and Control on Packaging Raw Materials in the Bottled Drinking Water Business (AMDK) PT XYZ Samarinda City
DOI:
https://doi.org/10.22441/ijiem.v5i3.23691Keywords:
Inventory, Bottle drinking water, Packaging raw materials, Material requirement planningAbstract
The production of bottled drinking water (AMDK) has growth of 10.4% from 2010 to 2019. One of the AMDK companies located in Samarinda City is PT XYZ. The produced product is water packaged in 220 ml glass containers. The raw materials for the 220 ml water packaging product include cups, cup lids, straws, cardboard boxes, and cardboard dividers. The AMDK business operated by PT XYZ has only been in operation since 2021, and there is currently no inventory planning and control for the raw materials used in the packaging of the 220 ml AMDK product. This has resulted in a lack of packaging raw material inventory, thus hindering the AMDK production process in the company. Based on this issue, this research is conducted to plan and control the inventory of 220 ml water packaging raw materials at PT XYZ, in order to optimize inventory costs and meet consumer demand for AMDK. Inventory planning and control are carried out using the Material Requirement Planning (MRP) method, and the method used to determine the lot size is the Economic Order Quantity (EOQ) method with shipping capacity constraints. Based on the data processing conducted, the optimal order quantities using the EOQ method with shipping capacity constraints for each packaging raw material are 15.000 pieces for cardboard and cardboard dividers with an inventory cost of IDR 267.112.900. 1.500.000 pieces for straws with an inventory cost of IDR 46.831.630. 540.000 pieces for cups with an inventory cost of IDR 232.026.718. 150 rolls for cup lids with an inventory cost of IDR 87.125.910. The total inventory cost for packaging raw materials for 220 ml AMDK cups is IDR 633.097.158.
Downloads
References
Aprilia, A., Sidik, M.D., & Fujiyanti, L. (2018). Sistem Penunjang Keputusan Persediaan Produksi Grafika dengan Pendekatan Economic Order Quantity (EOQ). Jurnal Pasti, 12(1), 34-49. https://publikasi.mercubuana.ac.id/index.php/pasti/article/view/2801
Aritantia, Y., Sumantri, Y., & Yuniarti, R. (2018). Perencanaan Persediaan Material Berdasarkan Integrasi Distribution Requirement Planning dan Material Requirement Planning pada PT PLN. Jurnal Rekayasa dan Manajemen Sistem Industri, 6(2), 411–421. http://jrmsi.studentjournal.ub.ac.id/index.php/jrmsi/article/view/979
Aspadin. (2021). Volume Produksi AMDK di Indonesia Tahun 2010-2019 [PowerPoint slides].
Assifa, A. H., dan Pujiyanto, E. (2022). Perencanaan Pengendalian Kebutuhan Bahan Baku Menggunakan Metode MRP di PT XYZ. Seminar dan Konferensi Nasional IDEC 2022.
Direktorat Jenderal Pelayanan Kesehatan. (2023,Jan). Penuhi Kebutuhan Air Putihmu Setiap Hari. https://yankes.kemkes.go.id/view_artikel/2035/penuhi-kebutuhan-air-putihmu-setiap-hari
Eunike, A., Herdianto, B., & Setyanto, N. W. (2017). Perencanaan Kebutuhan Bahan Baku Dengan Validasi Capacity Requirement Planning (CRP) Pada Perusahaan Rokok Sigaret Keretek Mesin (SKM). Prosiding SNTI dan SATELIT 2017, 114-120.
Eunike, A., Setyanto, N. W., Yuniarti, R., Hamdala, I., Lukodono, R. P., & Fanani, A. A. (2018). Perencanaan produksi dan pengendalian persediaan. Malang: UB Press.
Kadim. (2017). Penerapan Manajemen Produksi & Operasi Di Industri Manufaktur. Jakarta: Mitra Wacana Media.
Kemenperin. (2019, Feb). Peluang Industri AMDK Mengalir Deras di Tahun Politik. https://kemenperin.go.id/artikel/20354/
Mubin, A., Syahril, F. ., & Rosiani, T. Y. (2021). Sustainable EOQ Model with Multi Container Transportation Problems. Jurnal Teknik Industri, 22(2), 236–244. https://doi.org/10.22219/JTIUMM.Vol22.No2.236-244
Persyaratan Teknis Industri Air Minum Dalam Kemasan, Peraturan Menteri Perindustrian Republik Indonesia Nomor 96 Tahun 2011(2011). https://kemenperin.go.id/jawaban_attachment.php?id=554&id_t=5055
Refangga, M. A., Gusminto, E. B., & Musmedi, D. P. (2018). Analisis Pengendalian Kualitas Produk Air Minum Dalam Kemasan dengan Menggunakan Statistical Process Control (SPC) dan Kaizen Pada PT. Tujuh Impian Bersama Kabupaten Jember. Ekonomi Bisnis Dan Akuntansi (E-journal), 5(2), 164. https://doi.org/10.19184/ejeba.v5i2.8678
Setiawan, M. D., Wahono, B., dan ABS, M. K. (2020). Analisis Penerapan Material Requirement Planning (MRP) dalam Upaya Mengendalikan Bahan Baku (Studi Kasus pada CV Tirta Indo Megah). E-JRM: Elektronik Jurnal Riset Manajemen. 9 (24).
Silfiani, I., Kuncoro, D. K. R., & Sitania, F. D. (2021) Planning and Controlling Raw Materials Using The Material Requirements Planning Method. Jurnal Sains dan Teknologi. 17(2), pp 131-137. https://jim.unisma.ac.id/index.php/jrm/article/viewFile/8442/6999
Utama, R. E., Gani, N. A., Jaharuddin & Priharta, A. (2019). Manajemen Operasi. Tangerang Selatan: UM Jakarta Press.
Vikaliana, R., Sofian, Y., Solihati, N., Adji, D. B., & Maulia, S. S. (2020). Manajemen Persediaan. Bandung: Media Sains Indonesia.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









