Measurement of the Physiological Workload of Sorting Station Operators in A Palm Oil Processing Factory
DOI:
https://doi.org/10.22441/ijiem.v5i3.25071Keywords:
Workoad, Physiological, Palm oilAbstract
One of the palm oil processing industries in Riau that has isolated entrepreneurs as part of its work. Based on the results of continuous observations using the Nordic Body Map (NBM) Questionnaire, 75% of working waste handlers experience complaints in the hands, waist, and legs. So the workload of processing operators is measured using a physiological approach in one of the palm oil processing industries in Riau. Measurements using a physiological approach are carried out objectively using the method of heart rate, energy expenditure, %CVL, and energy consumption. Based on the principles of heart rate, energy expenditure budget and %CVL, the results were found to be non-standard which requires additional improvements based on the energy expenditure budget and %CVL method.Downloads
References
Akbar, M. A., Ramdhani, R. F., & Nuraeni, S. (2021). Analisis Beban Kerja Fisiologis dan Psikologis Menggunakan Metode Cardiovascular Load dan NASA TLX di PJT II Jatiluhur. Operations Excellence: Journal of Applied Industrial Engineering, 13(1), 139. https://doi.org/10.22441/oe.2020.v13.i1.014
Amelia Rosalina Putri & Arfan Bakhtiar. (2023). Analisis Beban Kerja Fisiologis Dan Psikologis pada Tenaga Kerja Bongkar Muat Bahan Peledak Menggunakan Metode Cardiovaskular Load (CVL) Dan National Aeronautics And Space Administration – Task Load Index (NASA- TLX) (Studi Kasus PT Semen Padang). Industrial Engineering Online Journal, 12(2).
Ariq Adhari Basri & Agustian Suseno. (2023). Klasifikasi Beban Kerja Berdasarkan Denyut Jantung Untuk Mengurangi Tingkat Kelelahan Dalam Bekerja. Journal Serambi Engineering (JSE), 8(3), 6056–6061. https://doi.org/10.32672/jse.v8i3
Atuna, V., & Safirin, M. T. (2023). Analysis of Employee Work Posture with the Quick Exposure Check (QEC) and Rapid Entire Body Assessment (REBA) Method (Case Study: CV. Wijaya Mandiri Label). IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 448. https://doi.org/10.22441/ijiem.v4i3.21369
Baihaqi, A. R., & Suryadi, A. (2024). Shift Work System Analysis of Store Employee Fatigue Using the Subjective Self Rating Test and Independent Sample T Test Methods (Case of Sports Station Plaza Surabaya). IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(1), 158. https://doi.org/10.22441/ijiem.v5i1.22245
Cahyo Kuncoroyekti, P. H., & Yuniawan, A. (2024). The Effect of Work Motivation, Work Stress and Work Environment on Employee Performance. IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(1), 314. https://doi.org/10.22441/ijiem.v5i1.21096
Euis Nina Saparina Yuliani, Ketut Tirtayasa, I Putu Gede Adiatmika, Hardianto Iridiastadi, & Nyoman Adiputra. (2021). Studi Literatur: Pengukuran Beban Kerja. Jurnal Penelitian Dan Aplikasi Sistem & Teknik Industri (PASTI), 15(2), 194–205. https://doi.org/10.22441/pasti.2021.v15i2.008
Hidayat, W., Ristyowati, T., & Putro, G. M. (2020). Analisis Beban Kerja Fisiologis sebagai Dasar Penentuan Waktu Istirahat untuk Mengurangi Kelelahan Kerja. OPSI, 13(1), 62. https://doi.org/10.31315/opsi.v13i1.3469
Lina Dianati Fathimahhayati, Theresia Amelia, & Andra Noor Syeha. (2019). Analisis Beban Kerja Fisiologi Pada Proses Pembuatan Tahu Berdasarkan Konsumsi Energi (Studi Kasus: UD. Lancar Abadi Samarinda). Jurnal INTECH Teknik Industri Universitas Serang, 5(2), 100–106. https://doi.org/10.30656/intech.v5i2.1695
Melliya, P. A., & Noveicalistus, H .D. (2023). Pengukuran Beban Kerja Fisik Dan Mental Dengan Metode CVL, Brouha Dan Nasa-Tlx Pada Operator SPBU Pertamina 64.783.14. INTEGRATE: Industrial Engineering and Management System, 7(1), 95–100.
Moh. Alyafi Dg. Matiro, Raman S. Mau, Abdul Rasyid, & Fentje Abdul Rauf. (2021). Pengukuran Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Pada Divisi Proses PT. Delta Subur Permai. Jambura Industrial Review (JIREV), 1(1). https://doi.org/10.37905/jirev.v1i1.7774
Muzakiki, M. A., Rizqi, A. W., & Priyana, E. D. (2023). Analisis Beban Kerja Fisiologis Pada Karyawan Bongkar Muat Bahan Bangunan Dengan Metode CVL Dan Konsumsi Kalori. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 9(2), 447. https://doi.org/10.24014/jti.v9i2.23051
Nadila, F. E., & Suryadi, A. (2024). Analysis of Work Posture and Risk of Musculoskeletal Complaints of Loading-Unloading Workers Using the REBA Method at PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(1), 69. https://doi.org/10.22441/ijiem.v5i1.21878
Pridynafiah, L., & Waluyo, M. (2024). Analysis of the Influence of Human Resource Development, Motivation, and Work Environment on Employee Performance and Employee Productivity (Case Study at PT. Mandiri Karya Kirana). IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(2), 465. https://doi.org/10.22441/ijiem.v5i2.22341
Rahayu, M. (2020). Analisis Beban Kerja Fisiologis Mahasiswa Saat Praktikum Analisa Perancangan Kerja dengan Menggunakan Metode 10 Denyut. UNISTEK, 7(1), 16–20. https://doi.org/10.33592/unistek.v7i1.463
Risky, T.A., Suardika, I. B., & Emmalia, A. (2021). Pengukuran Beban Kerja Fisiologis Untuk Mengurangi Keluhan Musculoskeletal Disorders (MSDS) Pada Pekerja Packaging Uppks Maharani. Jurnal Valtech, 4(1). https://doi.org/10.36040/valtech.v4i1.3393
Shakty Adhea Aditya, Ade Momon Subagyo, & Aldi Pratama. (2022). Analisis Fisiologi Kerja untuk Mengetahui Beban Kerja Fisik pada Pekerja Produksi di UKM Makaroni dan Kerupuk DO’A IBU. Jurnal Ilmiah Wahana Pendidikan, 8(3), 116–120. https://doi.org/10.5281/zenodo.6301701
Sitorus, T. M., Novia, C., Lubis, R. F., Zulhamidi, Z., & Senjawati, M. I. (2023). Analisis Lama Waktu Istirahat Berdasarkan Beban Kerja Operator Trolley Dengan Pendekatan Fisiologis Pada Crumb Rubber Industry Di Sumatera Barat. Jurnal Teknologi Dan Manajemen, 21(2), 125–130. https://doi.org/10.52330/jtm.v21i2.123
Souisa, J., Ariefiantoro, T., Susanto, S., & Niati, A. (2023). The Influence of Leadership Style, Work Stress, and Work Motivation on Employee Loyalty to PT. Hartono Palace of Technology. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(2), 133. https://doi.org/10.22441/ijiem.v4i2.20163
Vanny, R., Kusumah, A., & Ramadhan, R. R. (2023). Pengaruh Beban Kerja, Lingkungan Kerja Fisik Dan Lingkungan Kerja Non Fisik Terhadap Kinerja Karyawan Unit Gizi Rs Awal Bros Pekanbaru. Prosiding Seminar Nasional Ekonomi, Bisnis & Akuntansi, 3, 1087–1096.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









