Maintenance Management Jacro 175 Drill Rig for Coal Exploration Work Using the Reliability Centered Maintenance (RCM) Method in PT Inti Bangun Mulya
DOI:
https://doi.org/10.22441/ijiem.v7i1.30888Keywords:
Critical components, FMEA, RCM, Preventive maintenanceAbstract
PT. Inti Bangun Mulya was established in 2019 and is a company engaged in consulting and contracting services in the mining sector, including mapping, topography, mineral exploration, mineral modeling, mine design, mine economic evaluation, and resource and reserve calculation. This research aims to determine the critical components and to identify an effective and efficient maintenance schedule for the Jacro 175 Rig components. In determining critical components and creating a maintenance schedule, the researchers used Reliability Centered Maintenance (RCM) with the application of an appropriate and systematic maintenance system. This research uses a research method employing RCM and Failure Mode and Effect Analysis (FMEA). Data collection techniques include observation, interviews, and questionnaires. The initial steps taken by the author were to identify functions and failures, analyze system failures occurring in the Yanmar TF 105 machine, analyze critical level criteria, analyze FMEA, determine appropriate task selection, calculate the reliability value of critical components, and provide repair proposals in the form of an efficient maintenance schedule for critical components. The results of this study indicate that PT. Inti Bangun Mulya is known to implement a maintenance management system using a corrective maintenance system that is less effective and efficient for application to all components. Therefore, the author proposes an improvement in the form of a maintenance schedule for critical components.Downloads
References
Abdurrahman, S., & Pr. (2018). Study of Performance Efficiency of Jacro 175 Drilling Equipment in Coal Drilling of PT. Kwarsa Sentosa Abadi, Badak Mekar Village, Muara Badak District, Kutai Kartanegara Regency, East Kalimantan. JGP (Journal of Mining Geology), 2, 26–31.
https://doi.org/10.53640/jgp.v2i24.580
Afiva, WH, Atmaji, FTD, & Alhilman, J. (2019). Proposed Preventive Maintenance Interval and Maintenance Cost Estimation Using Reliability Centered Maintenance and FMECA Methods. Scientific Journal of Industrial Engineering, 18(2), 213–223. https://doi.org/10.23917/jiti.v18i2.8551
Ali Mutaufiq, IA (2021). Pengaruh Perencanaan Bahan Baku Dan Pemeliharaan Mesin Terhadap Efektifitas Proses Produksi. Ekonomi dan Bisnis, 1(1), 1–23.
http://dx.doi.org/10.56145/ekonomibisnis.v1i1.31
Ardiansyah, MF, & Widjajati, EP (2021). Scheduling of Preventive Maintenance on Mixing Machines in Fire Brick Production Using the Age Replacement Method at PT Xyz. Juminten, 2(1), 144–155. https://doi.org/10.33005/juminten.v2i1.219
Azwir, HH, Wicaksono, AI, & Oemar, H. (2020). Maintenance Management Using RCM Method on Paper Production Machine. Journal of Industrial System Optimization, 19(1), 12–21. https://doi.org/10.25077/josi.v19.n1.p12-21.2020
Candra, A. (2020). Optimization of Preventive Maintenance Using the Reliability Centered Maintenance Method. Technology: Scientific and Technological Journal, 2(2), 112. https://doi.org/10.32493/teknologi.v2i2.7899
Hisprastin, Y., & Musfiroh, I. (2020). Ishikawa Diagram and Failure Mode Effect Analysis (FMEA) as Methods Often Used in Quality Risk Management in Industry. Pharmaceutical Magazine, 6(1), 1. https://doi.org/10.24198/mfarmasetika.v6i1.27106
Kaimudin, Alpiana, & Rahmawati. (2020). Groundwater Drilling Mechanism in Kerandangan Village, Batu Layar District, West Lombok Regency, West Nusa Tenggara. Ulul Albab Journal, 24(1).
https://doi.org/10.31764/jua.v24i1.2257
Kurniawan, F., (2013). Industrial Maintenance Management. Graha Ilmu: Yogyakarta
Mahatman, AV, & Aidil. J. (2023). Proposed Maintenance Plan for Maker Machinery with Reliability Centered Maintenance (RCM) Method and Maintenance Value Stream Mapping (MVSM) at PT. XYZ. IJIEM (Indonesian Journal of Industrial Engineering & Management), 4(3), 549-558.
https://doi.org/10.22441/ijiem.v4i3.21445
Nasution, M., Bakhori, A., & Novarika, W. (2021). Benefits of the Need for Maintenance Management for Workshops and Industries. Main Engineering Bulletin, 16(3), 248–252.
https://doi.org/10.30743/but.v16i3.3789
Pradaka, MA, & Aidil SZS, J. (2021). Total Productive Maintenance Analysis Using OEE and FMEA Methods at the Phosporic Acid Factory of PT Petrokimia Gresik. Journal of Industrial Engineering, 11(3), 280–289. https://doi.org/10.25105/jti.v11i3.13087
Raharja, P. Ilham, Suardika, IB, & Galuh, WH (2021). Analysis of Lathe Machine Maintenance System Using. Innovative Industry, 2019(September 2019), 39–48. https://doi.org/10.36040/industri.v12i1
Rima, MS, & Tri, H. (2023). Analysis of the Implementation of Maintenance Systems Using the Reliability Centered Maintenance (RCM) Method on Cement Mill Type Mill at PT Cemindo Gemilang Medan. Blend Jurnal Teknik, 2(1).
https://doi.org/10.56211/blendsains.v2i1199
Sartika, D., Asngadi, A., & Syamsuddin, S. (2020). Analysis of Cco (Crude Coconut Oil) Machine Maintenance Case Study at PT. Spo Agro Resources. Journal of Management Science, Tadulako University (JIMUT), 6(1), 10–19. https://doi.org/10.22487/jimut.v6i1.167
Sudrajat, MF, Halim, L., (2022). PERANCANGAN AWAL DAN ANALISIS KINEMATIKA PURWARUPA MESIN JACRO. J-ENSISTEC (Journal of Engineering and Sustainable Technology), 09(01), 725-733.
https://doi.org/10.31949/jensitec.v9i01.3074
Sukania, IWS, & Wijaya, CW (2023). Analysis of Production Machine Maintenance System Using FMEA Method at PT. X. Journal of Energy and Manufacturing, 15(2), 103. https://doi.org/10.24843/jem.2022.v15.i02.p06
Sumasto, F., Christiani, J., Wulansari, I., Rozi, M, F., Dzulfikar, A., & Ismono, A. (2023). Application of Failure Mode and Effect Analysis (FMEA) for Defect Reduction: A Case Study on Scratch Defects in Oil Separator Parts in Machining Line. IJIEM (Indonesian Journal of Industrial Engineering & Management), 4(3), 632-643.
https://doi.org/10.22441/ijiem.v4i3.22768
Sunaryo, S., Hakim, L., & Jumali, D. (2018). Application of Reliability Centered Maintenance (RCM) on Wartsila Engine Gas Line System. Journal of Integrated Industrial Engineering, 1(2), 27–35. https://doi.org/10.31004/jutin.v1i2.220
Susanto, AD, & Azwir, HH (2018). Maintenance Planning on Screw Type Compressor Units Using RCM Method in Automotive Industry. Scientific Journal of Industrial Engineering, 17(1), 21. https://doi.org/10.23917/jiti.v17i1.5380
Taufi., Septyani, S. (2015). Determination of Critical Component Maintenance Time Interval on Turbine Engine at PT PLN (PERSERO) OMBILIN Power Generation Sector. Journal of Industrial System Optimization, 14(2).
https://doi.org/10.25077/josi.v14.n2.p238-258.2015
Wresni, A., Muhamad, F., Melfa, Y., & Harpito. (2020). Reliability Centered Maintenance on Critical Components of Press Machines. Journal of Industrial Engineering, 6(2).
http://dx.doi.org/10.24014/jti.v6i2.9701
https://www.forestdigest.com/detail/2087/batu-bara-kalimantan-timur#:~:text=Based on%20data%20from%20Kementerian%20Energy,bara%20yang%20extraction%20di%20Indonesia
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









