Analysis of Raw Material Inventory Control in The Amplang Production Process (Case Study: UD Taufik Jaya Makmur)
DOI:
https://doi.org/10.22441/ijiem.v6i3.31071Keywords:
Amplang, Inventory, Decomposition methods, Deterministic methods, Sensitivity analysisAbstract
UD Taufik Jaya Makmur is an SME that produces amplang in various shapes and packaging sizes. Inventory control at this SME faces several issues, such as the lack of production scheduling, high inventory costs, and changes in raw material prices, especially for tapioca flour and fish. These problems impact the quality of service and provide opportunities for competitors to attract consumers. Therefore, a deterministic method is employed to achieve optimal inventory control, which includes methods such as Economic Order Quantity (EOQ), Period Order Quantity (POQ), Least Unit Cost (LUC), Least Total Cost (LTC), Economic Part Period ( EPP), Part Period Balancing (PPB), Silver Meal, and Wagner Within. Calculations indicate that the optimal inventory for tapioca flour, after considering the minimum purchase lot from suppliers and warehouse capacity, is achieved using the Economic Part Period (EPP), Part Period Balancing (PPB), and Wagner Within methods. The inventory cost for meeting the demand for the next year is IDR733.802, with savings reaching 72% compared to the business policy. For fish, the optimal inventory is achieved using the Period Order Quantity (POQ), Least Unit Cost (LUC), Least Total Cost (LTC), and Wagner Within methods. The inventory cost is IDR9.159.728, with savings reaching 37% compared to the business policy. Sensitivity analysis shows that inventory control for tapioca flour and fish is sensitive to ordering costs (distribution), necessitating recalculations if there are future changes.Downloads
References
Ardila, N., Lubis, R. S., & Widyasari, R. (2022). Penerapan Metode Economic Part Period (EPP) dan Metode Part Period Balancing (PPB) Pada Pengendalian Persediaan Pil KB. SEPREN: Journal of Mathematics Education and Applied , 4(1), 114–122. https://doi.org/10.36655/sepren.v4i1
Aritantia, Y., Sumantri, Y., & Yuniarti, R. (2018). Inventory Planning of Material Based on Integration of Distribution Requirement Planning and Material Requirement Planning at PT. PLN. Jurnal Rekayasa Dan Manajemen Sistem Industri, 6(2).
Aryati, A., Purnamasari, I., & Nasution, Y. N. (2020). Peramalan dengan Menggunakan Metode Holt-Winters Exponential Smoothing (Studi Kasus: Jumlah Wisatawan Mancanegara yang Berkunjung Ke Indonesia). Jurnal EKSPONENSIAL, 11(1). https://doi.org/ 10.30872/eksponensial.v11i1.650
Assauri, S. (2016). Manajemen Operasi Produksi. Rajawali Pers.
Badan Pusat Statistik Indonesia. (2024). Inflasi year-onyear (y-on-y) pada Desember 2023 sebesar 2,61 persen. https://www.bps.go.id/id/pressrelease/2024/01/02/2299/%20inflasi-year-on-year--y-on-y--pada-desember-2023-sebesar-2-61-persen--inflasi-tertinggi-terjadi-di-sumenep-sebesar-5-08-persen-.html
Badan Pusat Statistik Provinsi Kalimantan Timur. (2024). Ekonomi Provinsi Kalimantan Timur Tahun 2023 Tumbuh Sebesar 6,22 Persen. https://kaltim.bps.go.id/id/pressrelease/2024/02/05/1120/ekonomi-provinsi-kalimantan-timur-tahun-2023-tumbuh-sebesar-6-22-persen.html
Fani, E., Widjajati, F. A., & Soehardjoepri. (2017). Perbandingan Metode Winter Eksponensial Smoothing dan Metode Event Based untuk Menentukan Penjualan Produk Terbaik di Perusahaan X. Jurnal Sains Dan Seni ITS, 6(1), A1–A5.
Fitriyani, E., & Siahaan, M. (2020). Analisis Pengendalian Persediaan Bahan Baku dengan Menggunakan Metode EOQ pada PT Sigma Indonesia MFG. Journal of Management, 1(2), 102–106. https://doi.org/10.37010/jdc.v1i2
Fitroni, M. R. A., & Pulansari, F. (2024). Analysis of PVC-based Product Inventory Control with Economic Production Quantity and Lagrange Multiplier Methods at PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 5(1), 148–157. https://doi.org/10.22441/ijiem.v5i1.22308
Kristiyanti, D. A., & Sumarno, Y. (2020). Penerapan Metode Multiplicative Decomposition (Seasonal) Untuk Peramalan Persediaan Barang Pada PT. Agrinusa Jaya Santosa. Jurnal Sistem Komputer Dan Kecerdasan Buatan, 3(2), 45–51. https://doi.org/ 10.47970/siskom-kb.v3i2.145
Kumila, A., Sholihah, B., Evizia, E., Safitri, N., & Fitri, S. (2019). Perbandingan Metode Moving Average dan Metode Naïve Dalam Peramalan Data Kemiskinan. JTAM | Jurnal Teori Dan Aplikasi Matematika, 3(1), 65. https://doi.org/10.31764/jtam.v3i1.764
Nasution, A. H., & Prasetyawan, Y. (2008). Perencanaan & Pengendalian Produksi. PT Graha Ilmu: Yogyakarta.
Natalya, Kambolong, M., & Yusuf, M. (2018). Analisis Pengaruh Kualitas Pelayanan Terhadap Kepuasan Konsumen pada PT. Matahari Departement Store Lippo Plaza Kendari. Jurnal Administrasi Bisnis, 3(1), 104–114. https://doi.org/ 10.52423/bujab.v3i1.9602
Nugraha, E. Y., & Suletra, I. W. (2017). Analisis Metode Peramalan Permintaan Terbaik Produk Oxycan pada PT. Samator Gresik. Seminar Dan Konferensi Nasional IDEC, 414–422.
Portal Kaltim. (2018). Produk K-UMKM Amplang. https://www.kaltimprov.go.id/berita/amplang
Putrianti, E. E., Wahyuda, & Sitani, F. D. (2024). Soybean Inventory Management in the Production Process of the Semoga Laris Tofu Factory. IJIEM (Indonesian Journal of Industrial Engineering & Management), 5(2), 379–391. https://doi.org/10.22441/ijiem.v5i2.24140
Rabbani, K. J., Wahyuda, & Sitania, F. D. (2022). Analisis Pengendalian Persediaan Kedelai pada PRIMKOPTI Guna Memenuhi Kebutuhan Produksi Industri Tahu Tempe di Balikpapan. G-Tech: Jurnal Teknologi Terapan, 6(2), 284–294. https://doi.org/10.33379/gtech.v6i2.1709
Rahmawi, R., Sari, R. F., & Batubara, A. U. (2023). Metode Just In Time dan Algoritma Wagner Within dalam Pengendalian Persediaan Alat Kesehatan. Jurnal Bayesian: Jurnal Ilmiah Statistika Dan Ekonometrika, 3(2), 161–173. https://doi.org/ 10.46306/bay.v3i2.57
Santoso, & Heryanto, R. M. (2017). Perencanaan dan Pengendalian Produksi 1. Penerbit Alfabeta.
Satu Data Indonesia. (2024). Data UMKM Prov. Kaltim Tahun 2021-2023. https://katalog.data.go.id/dataset/data-umkm
Solahuddin, A., & Andari, T. T. (2018). Analisis Pengendalian Persediaan Untuk Meminimalisasi Biaya pada Bahan Kemasan Botol 70 Ml 8 Gram di PT. Milko Beverage Industry Bogor. Jurnal Visionida, 4(2), 54–66. https://doi.org/10.30997/jvs.v4i2.1532
Syaifulloh, A. (2018). Perbandingan 6 Metode Forecasting dalam Peramalan Jumlah Maba STMIK PPKIA Pradnya Paramita Malang. Jurnal Teknologi Informasi, 9(2), 91–98. https://doi.org/10.36382/jti-tki.v9i2.328
Utami, S. F., Arisma, S. Y., Hermanto, K., & Ruskartina, E. (2020). Peramalan Jumlah Penjualan Sepeda Motor Menggunakan Metode Time Series Studi Kasus: Dealer Motor Nusantara Surya Sakti (NSS) Sumbawa. Jurnal Teknik Dan Sains Fakultas Teknik Universitas Teknologi Sumbawa, 1(2), 33–41. https://doi.org/10.36761/hexagon.v1i2
Yuliyanti, R., & Arliani, E. (2022). Peramalan Jumlah Penduduk Menggunakan Model Arima. Jurnal Kajian Dan Terapan Matematika, 8(2), 114–128. https://doi.org/10.21831/jktm.v8i2.18265
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









