Soybean Inventory Management in the Production Process of the Semoga Laris Tofu Factory
DOI:
https://doi.org/10.22441/ijiem.v5i2.24140Kata Kunci:
Inventory, Forecasting, Min-max method, EOQ, Capital constraintAbstrak
Semoga laris tofu factory is one of the food industry businesses, where the factory processes soybeans into tofu products. The problem that occurs in the management of inventory at the semoga laris tofu factory is that the factory tends to be unprepared for unexpected circumstances, which is caused by the fact that the value of safety stock on raw material inventory has not been determined. At the semoga laris tofu factory hopefully laris there are also capital restrictions on the purchase of raw materials, where the available capital is IDR 30,000,000. This study aims to evaluate the inventory management carried out by the factory by comparing the Min-Max Method, the Economic Order Quantity (EOQ) Method with the tofu factory policy, which after obtaining the optimal Q is then calculated using the working capital constraint method if the results of the optimal Q cannot be met by the available capital. Based on the results of calculations carried out in this study, calculations with the Basic EOQ method have more optimal Q results compared to other methods. However, the basic EOQ calculation exceeds the existing capital limit, because the cost of purchasing raw materials costs IDR 105,450,000. Based on the existence of capital-related restrictions, the calculation is continued with the capital constraint EOQ method. EOQ with this capital constraint has a quantity for one order of 52 bags with a capital cost of IDR 29,640,000.
Unduhan
Referensi
Aritantia, Y., Sumantri, Y., & Yuniarti, R. (2018). Perencanaan Persediaan Material Berdasarkan Integrasi Distribution Requirement Planning Dan Material Requirement Planning Pada PT. PLN. Jurnal Rekayasa Dan Manajemen Sistem Industri, 6(2).
Indiyanto, R. (2008). Perencanaan Dan Pengendalian Produksi. Klaten: Penerbit Yayasan Humaniora.
Indrajit, R. E., dan Djokopranoto, R. (2004). Dari MRP Menuju ERP. Jakarta: PT. Gramedia Widiasarana Indonesia.
Heriansyah, E., & Hasibuan, S. (2018). Implementasi Metode Peramalan pada Permintaan Bracket Side Stand K59A. Jurnal PASTI, 12(2), 209–223. https://publikasi.mercubuana.ac.id/index.php/pasti/article/view/3722
Hertanto, R. H. (2020). Metode Min-Max Dan Penerapannya Sebagai Pengendali Persediaan Bahan Baku Pada Pt. Balatif Malang. Adbis: Jurnal Administrasi Dan Bisnis, 14(2), 161. https://doi.org/10.33795/j-adbis.v14i2.102
Hidayati, A., & Pulansari, F. (2023). Performance Measurement Supply Chain Management (SCM) Using the Supply Chain Operation Reference (SCOR) Method at PT X. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(2), 173. https://doi.org/10.22441/ijiem.v4i2.20506
Kadim, A. (2017). Penerapan Manajemen Produksi dan Operasi Di Industri Manufaktur. In Jakarta: Mitra Wacana Media.
Lumban Raja, V. N. (2022). Mini Oreo Cup Production Plan with Aggregate Method to Minimize Production Costs. IJIEM - Indonesian Journal of Industrial Engineering and Management, 3(3), 224. https://doi.org/10.22441/ijiem.v3i3.15787
Lusiana, A., & Yuliarty, P. (2020). Penerapan Metode Peramalan (Forecasting) Pada Permintaan Atap di PT X. Industri Inovatif : Jurnal Teknik Industri, 10(1), 11–20. https://doi.org/10.36040/industri.v10i1.2530
Mail, A., Asri, M., Padhil, A., Takdir, A., dan Chairany, N. (2018). Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-Max Stock di PT. Panca Usaha Palopo Plywood. JIEM, Vol 3 No. 1. https://doi.org/10.33536/jiem.v3i1.198
Mushollaeni, W., Tantalu, L., & Malo, M. (2021). Komposisi gizi tahu kombinasi dari kacang tunggak dan kedelai yang dibuat dengan bahan penggumpal asam cuka dan biang tahu. Teknologi Pangan : Media Informasi Dan Komunikasi Ilmiah Teknologi Pertanian, 13(1), 29–37. https://doi.org/10.35891/tp.v13i1.2742
Ningrum, D. T. K., & Purnawan. (2022). Evaluasi Pengendalian Persediaan Bahan Baku UPVC dengan Perbandingan Metode EOQ, POQ, dan Min-Max Pada PT XYZ. Industrial Engineering Online Journal, 11(3), 1–9. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/34377
Rangkuti, F. (2007). Manajemen persediaan. Jakarta: PT. RajaGrafindo Persada.
Rozaq, M. R. A., & Mahbubah, N. A. (2022). Efisiensi Persediaan Kantong Semen Berbasis Metode MIN-MAX, EOQ, dan TWO-BIN di Packing Plant PT AKA. Sigma Teknika, 5(2), 259–266. https://doi.org/10.33373/sigmateknika.v5i2.4637
Siswanto. (2007). Operations Research Jilid II. Jakarta: Erlangga.
Sucipto, L., & Syaharuddin, S. (2018). Konstruksi forecasting system multi-model untuk pemodelan matematika pada peramalan indeks pembangunan manusia provinsi nusa tenggara barat. Register: Jurnal Ilmiah Teknologi Sistem Informasi, 4(2), 114–124. https://doi.org/10.26594/register.v4i2.1263.
Wulandari, L. M. C., dan Indrianto, L. D. (2021). Analisis Pengendalian Persediaan Bahan Baku Biji Plastik Menggunakan Pendekatan Simulasi Monte Carlo. Jurnal Teknik Industri Universitas Katolik Darma Cendika, Vol 14 No. 1. http://jurnal.upnyk.ac.id/index.php/opsi/article/download/4744/3598
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









