Evaluation of the Effectiveness of Sewage Treatment Plant Performance in GKM Green Tower Building
DOI:
https://doi.org/10.22441/jtm.v14i1.18734Keywords:
Wastewater, Sewage Treatment Plant (STP), GKM Green Tower Building, Domestic wastewater quality standardAbstract
Wastewater or wastewater is the remaining water that is disposed of, originating from households, industries, offices, and other public places. A sewage treatment plant (STP) is a process of reusing wastewater and removing contaminants from wastewater. This study evaluates the Sewage Treatment Plant system in the GKM Green Tower Building. This study aims to analyze the performance of the Sewage Treatment Plant (STP) in the GKM Green Tower building and to determine the effectiveness of the performance of the Sewage Treatment Plant (STP) in the GKM Green Tower building. The parameters used in this study were pH (acidity), COD, BOD, TSS, oil and grease, Total Coliform, and Ammonia, which complies with Domestic Wastewater Quality Standards Based on the Regulation of the Minister of Environment and Forestry of the Republic of Indonesia Number: P.68/ Menlhk-Setjen/2016. Recycled water in the GKM Green Tower building is used to flush closed urinals and water plants. It was found that the results of clean wastewater management in the GKM Green Tower building still look cloudy and smelly. Based on the results of domestic wastewater monitoring tests at GKM Green Tower in August / prior to analysis, several parameters exceeded the quality standards, namely TSS and Total Coliform. The maintenance carried out so far on the Sewage Treatment Plant (STP) system in the GKM Green Tower Building is still not good, which is the cause of the ineffectiveness of the wastewater that has been managed so far. The results of the second test conducted in November showed a decrease in the numbers between the TSS 4 and Total Coliform parameters between 1100. So that they were in accordance with the quality standards set by the government Ministry of Environment.Downloads
References
P. N. Rahardjo, “IDENTIFIKASI MASALAH IPAL DOMESTIK GEDUNG PERKANTORAN DAN ALTERNATIF UNTUK MENGATASINYA,” Pusat Teknologi Lingkungan - Badan Pengkajian dan Penerapan Teknologi (BPPT, Jakarta, 2016.
J. Ganesan, “Performance Evaluation of Sewage Treatment Plants (STPs) in Multistoried Buildings Nature Environment and Pollution Technology An International Quarterly Scientific Journal,” Nature Enviroment and Pollution Technology, vol. Vol. 14, pp. 1-6, 2015.
N. Mujahid, “Evaluasi Kinerja Sewage Treatment Plants (Stp) Gedung Di Kampus Teknik Gowa,” UNIVERSITAS HASANUDDIN, GOWA, 2017.
N. A. Widadio, “72,7 Persen Sumber Pencemaran Sungai Dari Limbah Permukiman,” Media Indonesia, 13 September 2018. [Online]. Available: https://mediaindonesia.com/megapolitan/184273/727-persen-sumber-pencemaran-sungai-dari-limbah-permukiman. [Diakses Agustus 23 2022].
Suwarno, “PEMANFAATAN LIMBAH CAIR STP (SEWAGE TREATMENT PLANT) SEBAGAI MEDIA TANAM HIDROPONIK TANAMAN SAWI (BRASICA JUNCEA L) PT X DI CIKARANG,” Universitas Pelita Bangsa, Bekasi, 2019.
Burhanuddin, “STUDI BESARNYA ARUS LISTRIK YANG MENGALIR PADA BEBAN MOTOR DAN POMPATERHADAP PENGELOLAAN LIMBAH AIR KOTOR,” UNIVERSITAS MUHAMMADIYAH MAKASSAR, MAKASSAR, 2020.
D. Y. RINKA, “Perencanaan Sistem Plambing Air Limbah dengan Penerapan Konsep Green Building pada Gedung Panghegar Resort Dago Golf-Hotel&Spa,” Jurnal Institut Teknologi Nasional, vol. Vol.2 , pp. 2-12, 2014.
M. R. Fernando, “Penggunaan Air Limbah Industri,” Institut Teknologi Bandung, Bandung, 2019.
D. S. UTAMI, “EFEKTIVITAS PROGRAM WATER TREATMENT PLANT (WTP) DALAM MENINGKATKAN KUALITAS PELAYANAN AIR BERSIH DI PDAM TIRTANADIMEDAN CABANG SEI AGUL,” Universitas Muhammadiyah Sumatera Utara, Medan, 2019.
permrnLHK, “170314114854P.68 BAKU MUTU LIMBAH DOMESTIK,” [Online]. Available: https://ppkl.menlhk.go.id/website/filebox/5/170314114854P.68%20BAKU%20MUTU%20LIMBAH%20DOMESTIK.pdf. [Diakses 17 September 2022].
I. Dayinta, ““Re-Design Sistem Plambing Gedung Dekanat Fakultas Teknik Universitas Diponegoro Dengan Konsep Green Building,” UNIVERSITAS DIPONEGORO, 2020, 2020.
A. Muqorrobin, “REDESAIN SYSTEM PENGOLAHAN AIR LIMBAH PADA SEWAGE TREATMENT PLANT (STP) UNTUK PENINGKATAN KUALITAS AIR LIMBAH DI CENTRAL PARK MALL JAKARTA,” UNIVERSITAS MERCUBUANA, Jakarta, 2017.
I. Y. Fisma, “ANALISIS AIR LIMBAH YANG MASUK PADA WASTE WATER TREATMENT PLANT (WWTP),” Universitas Islam Negeri Ar-Raniry, Banda Aceh, 2020.
M. IR.H.Mustakim, “ANALISIS EFEKTIVITAS PENGOLAHAN LIMBAH CAIR PADA PT PERTAMINA REFINERY UNIT V BALIKPAPAN,” Balikpapan, 2017.
Rifan, “SISTEM PENGOLAHAN DAN RECYCLE LIMBAH DI GEDUNG PARKIR DAN STASIUN INTERMODA JOYOBOYO SURABAYA,” Seminar Keinsinyuran, vol. Vol.2, pp. 1-8, 2021.
R. R. A. Siswoyo, “EVALUASI NILAI KEANDALAN GEDUNG DARI ASPEK PENGELOLAAN AIR LIMBAH DAN DRAINASE AIR HUJAN DI RSUD GENTENG,” Seminar Nasional Terapan Riset Inovatif (SENTRINOV) ke-VII, vol. Vol. 7, pp. 1-11, 2021.
R. GULTOM, “ANALISA SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK KOTA MEDAN,” UNIVERSITAS MEDAN AREA, Medan, 2017.
A. W. Biantoro, “Performance Analysis of DN1750 and DN1800 Electric Submersible Pump for Production Optimization on the Oil Well,” International Journal of Advanced Technology in Mechanical, Mechatronics and Materials (IJATEC), Vol. %1 dari %2Vol. 03, No. 1, p. 39, 2022.
Andi, “GKM Tower, TB Simatupang, Jakarta Selatan,” 23 Februari 2018. [Online]. Available: https://www.indoplaces.com/mod.php?mod=indonesia&op=view_region®id=5846. [Diakses 10 September 2022].
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.
This work is also licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.









