Analysis of cement raw material control using the min-max stock method in the PT semen bosowa maros
DOI:
https://doi.org/10.22441/oe.2023.v15.i2.085Keywords:
inventory, raw material, min-max stock, safety stockAbstract
Inventory of raw materials is one of the crucial problems in the company. Errors in determining the size of raw material inventory is very influential for the smooth production of the company. PT Semen Bosowa Maros is a private company that focuses on cement production. This study aims to avoid excess and shortage of raw materials by calculating the amount of raw material inventory at PT Semen Bosowa Maros. This study uses the Min-Max Stock method. The research data was obtained from the company's annual data with related parties. The results of the study obtained safety stock values of Silica Sand 166.46 ton’s, Gypsum 1482.96 ton’s, Fly Ash 33.71 ton’s, and Trass 30.76 ton’s. Then, the minimum inventory calculation is carried out, it is known that the minimum inventory results are found in Trass raw materials of 260.18 ton’s while the results for maximum inventory are in Gypsum of 22117.18 ton’s. After calculating the min-max, an order policy can be obtained for each material, Silica Sand 1074.85 ton’s, Gypsum 9575.63 ton’s, Fly Ash 217.68 ton’s, and Trass 198.65 ton’s.
Downloads
References
Audina, S., & Bakhtiar, A. (2021). Analisis Pengendalian Persediaan Aux Raw Material Menggunakan Metode Min-Max Stock Di Pt. Mitsubishi Chemical Indonesia. J@ti Undip: Jurnal Teknik Industri, 16(3), 161–168. https://doi.org/10.14710/jati.16.3.161-168
Dahlan, M., Ahmad, A., Pawennari, A., & Alimuddin, W. (2022). Pengendalian Persediaan Bahan Bakar Solar Menggunakan Model Probabilistik pada SPDN Baji Pamai Maros. Conference SENATIK STT Adisutjipto Yogyakarta, 7. https://doi.org/10.28989/senatik.v7i0.443
Fatma, E., Indriani, I., & Fitriana, M. (2019). Perencanaan Persediaan Komponen Pada Perusahaan Original Equipment Manufacturer Menggunakan Metode Persediaan Deterministik Dinamis. Spektrum
Industri, 17(1), 1–9. http://www.nber.org/papers/w16019
Goldiantero, Z., Rif’ah, M. I., & Sodikin, I. (2020). Optimalisasi Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-Max Stock. Jurnal Rekayasan Dan Inovasi Teknik Industri, 8(2), 23–28. https://ejournal.akprind.ac.id/index.php/rekavasi/article/view/3205/2811
Jufriyanto, M. (2020). Peramalan Permintaan Keripik Singkong Pada UMKM Difaa dengan Simulasi Monte Carlo. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 6(2), 107. https://doi.org/10.24014/jti.v6i2.10452
Kinanthi, A. P., Herlina, D., & Mahardika, F. A. (2016). Analisis Pengendalian Persediaan Bahan Baku Menggunakan Metode Min-Max (Studi Kasus PT.Djitoe Indonesia Tobacco). PERFORMA : Media Ilmiah Teknik Industri, 15(2), 87–92. https://doi.org/10.20961/performa.15.2.9824
Muthalib, I. S., Rusman, M., & Griseldis, G. L. (2020). Overall Equipment Effectiveness (OEE) analysis and Failure Mode and Effect Analysis (FMEA) on Packer Machines for minimizing the Six Big Losses-A cement industry case. IOP Conference Series: Materials Science and Engineering, 885(1). https://doi.org/10.1088/1757-899X/885/1/012061
Nivasanon, C., Srikun, I., & Aungkulanon, P. (2021). Aggregate production planning: A case study of installation elevator company. Proceedings of the International Conference on Industrial Engineering and Operations Management, 5357–5365.
Oey, E., Wijaya, W. A., & Hansopaheluwakan, S. (2020). Forecasting and aggregate planning application – a case study of a small enterprise in Indonesia. International Journal of Process Management and Benchmarking, 10(1), 1–21. https://doi.org/10.1504/IJPMB.2020.104229
Padhil, A., Chairany, N., Ahmad, A., Ramli, H., & Malik, R. (2021). Supply Chain Risk Analysis in Kub – Ik Mataram Macoa With House of Risk (Hor). Journal of Industrial Engineering Management, 6(2), 51–60. https://doi.org/10.33536/jiem.v6i2.942
Pradana, V. A., & Jakaria, R. B. (2020). Pengendalian Persediaan Bahan Baku Gula Menggunakan Metode EOQ Dan Just In Time. Bina Teknika, 16(1), 43. https://doi.org/10.54378/bt.v16i1.1816
Rizky, C., Sudarso, Y., & Sadriatwati, S. E. (2016). Analisis Perbandingan Metode EOQ dan Metode POQ dengan Metode Min-Max dalam Pengendalian Persediaan Bahan Baku Pada PT. Sidomuncul Pupuk Nusantara. Admisi Dan Bisnis, 17(1), 78. http://kbbi.web.id/biolit
Rosyidi, M. R., & Zabadi, F. F. (2019). Perencanaan Produksi pada Produk Hollow dengan Ukuran 15 mm X 35 mm X 0.30 mm. Jurnal Rekayasa Sistem Industri, 8(1), 27–38. https://doi.org/10.26593/jrsi.v8i1.3099.27-38
Setiawan, I., Nurdiansyah, Tosin, M., Lusia, V., & Wahid, M. (2022). Aggregate Planning Implementation for Planning and Controlling the Materials in the Beverage Packaging Industry. Spektrum Industri, 20(1), 95–104. https://doi.org/10.12198/spektrum.v20i1.25
Taufik, D. A., Setiawan, I., Wahid, M., Rochim, A., & Tosin, M. (2021). Integrasi Linear Regression dan Aggregate Planning untuk Perencanaan dan Pengendalian Produksi Leaf Spring Hino OW 190/200 di Industri Komponen Otomotif. Operations Excellence: Journal of Applied Industrial Engineering, 13(2), 245. https://doi.org/10.22441/oe.2021.v13.i2.023
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









