Penerapan Lean Manufacturing untuk Pengaplikasian Price Term Terbaik melalui Analisis TOPSIS: Kasus Industri Elektronik Berfasilitas Kawasan Berikat
DOI:
https://doi.org/10.22441/oe.2022.v14.i1.042Keywords:
procurement of goods, bonded zone, price term, TOPSISAbstract
To maintain customer loyalty, punctual delivery is needed. In Indonesia, the government has regulated industrial regulations, especially manufacturing with imported raw materials through the provision of special facilities. One of these facilities is a bonded zone facility. In the application to the procurement process, several special rules extend the flow of the goods procurement process which is feared to have an impact on delivery delays and large inventory levels. In terms of price term performance, the TOPSIS method is used, and the data is taken from questionnaires the Korea CKD Import Planner, China CKD Import Planner, Chemical Import Planner, and Steel Sheet Import Planner, with criteria for late delivery of goods, incomplete document completeness, length of COO processing. Certificate of Origin), duration of export-import licensing, risk in shipping, selection of forwarder (3PL), selection of vessel schedule, and costs. From the results of the questionnaire, a normalized matrix was made. From this matrix, the distance between positive and negative solutions is sought so that the preference value of each alternative is obtained, and the price term CIP (Cost & Insurance Paid) is obtained as the price term with the closest relative closeness with a value of 0.5042.
Downloads
References
Abdulmalek, F.A., & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study. International Journal of Production Economics, 107(1), 223-236. https://doi.org/10.1016/j.ijpe.2006.09.009
Biswas, T.K., & Das, M.C. (2020). Selection of the barriers of supply chain management in Indian manufacturing sectors due to Covid-19 impacts. Operational Research in Engineering Sciences: Theory and Applications, 3(3), 1-12. https://doi.org/10.31181/oresta2030301b
Hasibuan, S. (2018). Modul 1 Procurement Logistic 2018. In Procurement Logistic (pp. 2–3).
Henny, H., & Budiman, H. R. (2018). Implementation lean manufacturing using Waste Assessment Model (WAM) in shoes company. IOP Conference Series: Materials Science and Engineering, 407(1), 1–6. https://doi.org/10.1088/1757-899X/407/1/012077
Hsu, C. H., Chang, A. Y., & Luo, W. (2017). Identifying key performance factors for sustainability development of SMEs – integrating QFD and fuzzy MADM methods. Journal of Cleaner Production, 161, 629–645. https://doi.org/10.1016/j.jclepro.2017.05.063
Lake, A.A., Burgoine, T., Stamp, E., & Grieve, R. (2012). The foodscape: classification and field validation of secondary data sources across urban/rural and socio-economic classifications in England. International Journal of Behavioral Nutrition and Physical Activity, 9(1), 37.
Lestari, R. I., & Sriyanto, S. (2016). Pendekatan Multi Attributes Decision Making dengan Metode Topsis dalam Pemilihan Lokasi Perakitan Studi Kasus PT. Hartono Istana Teknologi. Industrial Engineering Online Journal, 5(4).1-5
Liker, J.K., & Meier, D. (2006). The Toyota Way Fieldbook (1st ed.). McGraw-Hill Education.
Novaes, A.G.N., Lima, O.F., Luna, M.M.M., & Bez, E. T. (2017). Mitigating Supply Chain Tardiness Risks in OEM Milk-Run Operations. Lecture Notes in Logistics, January, 141–150. https://doi.org/10.1007/978-3-319-45117-6_13
Nugroho, M.Z.P., Nugroho, M.E., & Susanti, M. (2020). Study and Analysis of Delays in the Material Procurement Process: A case study of Steel Manufacturing Companies at Indonesia. International Journal of Engineering Research and Advanced Technology, 06(01), 01–08. https://doi.org/10.31695/ijerat.2020.3588
Pratiwi, F., & Hasibuan, S. (2020). Perencanaan persediaan bahan baku amoxicillin menggunakan metode material requirement planning: studi kasus. Operations Excellence: Journal of Applied Industrial Engineering, 12(3), 344-354. doi:http://dx.doi.org/10.22441/oe.2020.v12.i3.007
Pujihastuti, I. (2010). Prinsip Penulisan Kuesioner Penelitian. CEFARS: Jurnal Agribisnis dan Pengembangan Wilayah, 2(1), 43-56.
Rochmoeljati, R. (2012). Pengukuran Kinerja Supplier Berdasarkan Vendor Performance Indicator Dengan Metode Quality Cost Delivery Flexibility Responsiveness (Studi Kasus : Pt Boma Bisma Indra Surabaya ). Journal of Industrial Engineering and Management, 1(2).
Setiawan, L., & Hasibuan, S. (2021). Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing. Quality Innovation Prosperity, 25(2), 19-36.
Setiawan, Setiawan, I., Jaqin, C., Prabowo, H.A., & Purba, H.H. (2021). Integration of Waste Assessment Model and Lean Automation to Improve Process Cycle Efficiency in the Automotive Industry. Quality Innovation Prosperity, 25(3), 48–64. https://doi.org/10.12776/qip.v25i3.1613
Silitonga, M.P.R. & Hasibuan, S. (2019). Analisa Pemilihan Supplier Bahan Baku Pasir pada Industri Beton dengan Metode Integrasi AHP dan TOPSIS. Rekayasa Sipil, 8(1), 39-49.
Sugiyono. (2017). Metode Penelitian Kuantitatif, Kualitatif, dan R&D (1st ed.). CV Alfabeta.
Taufik, D.A., Setiawan, I., Wahid, M., Rochim, A., & Tosin, M. (2021). Integration of linear regression and aggregate planning for Hino OW 190/200 Leaf Spring production planning and control in the automotive component industry. Operations Excellence: Journal of Applied Industrial Engineering, 13(2), 245. https://doi.org/10.22441/oe.2021.v13.i2.023
Wicaksono, M., Fathimahhayati, L.D., & Sukmono, Y. (2020). Pengambilan Keputusan Dalam Pemilihan Supplier Dengan Metode Analytical Hierarchy Process (AHP) dan Technique For Others Reference by Similarity to Ideal Solution (TOPSIS). Jurnal Tekno, 17(2), 1–17. https://doi.org/10.33557/jtekno.v17i2.1078
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.