Penentuan Waktu Baku Optimal dan Analisis Beban Kerja Pada Bagian Produksi Udang PCDTO-IQF di PT. Indo American Seafoods

Penulis

  • Dio Arief Utama Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Indonesia. http://orcid.org/0000-0002-4515-4586
  • Andhyka Tyaz Nugraha Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Lampung, Indonesia 35365 http://orcid.org/0000-0001-7289-2886
  • Rizqi Wahyudi Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Lampung, Indonesia 35365 http://orcid.org/0000-0001-9624-9123

DOI:

https://doi.org/10.22441/pasti.2023.v17i2.002

Kata Kunci:

Waktu Standar, Beban Kerja, Jumlah Tenaga Optimal, Stopwatch Time Study, Workload Analysis

Abstrak

Faktor tenaga kerja, waktu kerja dan beban kerja berpengaruh terhadap produktivitas suatu perusahaan industri. Berdasarkan isu tersebut maka penelitian ini bertujuan untuk menetapkan waktu standar, beban kerja pekerja dan jumlah pekerja optimal pada bagian produksi Udang PCDTO-IQF di PT. Indo American Seafoods dengan menggunakan metode Stopwatch Time Study. Data penelitian diperoleh secara langsung dengan cara mengukur waktu kerja pada bagian produksi menggunakan instrumen stopwatch. Hasil penelitian mendapatkan total waktu standar yang dibutuhkan untuk produksi Udang PCDTO-IQF sebesar 17.089,83 detik atau 4,75 jam. Beban kerja untuk proses produksi memiliki 29 proses, terdapat 11 proses memiliki beban kerja lebih dari 100% atau beban kerja normal, selebihnya memiliki beban kerja normal. Berdasarkan temuan tersebut maka direkomendasikan agar perusahaan melakukan penambahan jumlah pekerja untuk beban kerja berlebih serta melakukan pengurangan ataupun pemindahan tenaga kerja pada bagian dengan beban kerja rendah ke bagian lainnya yang membutuhkan lebih banyak tenaga kerja.

Unduhan

Data unduhan belum tersedia.

Biografi Penulis

Dio Arief Utama, Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Indonesia.

Dio Arief Utama is a student at Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Indonesia.

Andhyka Tyaz Nugraha, Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Lampung, Indonesia 35365

Andhyka Tyaz Nugraha is a lecturer and researcher at Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Indonesia. Research Interests: Agribusiness, Technology Management, Strategic Management, Supply Chain Management, Energy-Economics, Environment-Economics, Applied Econometrics, Sustainable Development, Green Human Resources Management, Structural Equation Modelling, and Macroeconomics.

Rizqi Wahyudi, Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Lampung, Indonesia 35365

Rizqi Wahyudi, S.T.P., M.Sc. is a lecturer at Department of Industrial Engineering, Faculty of Technology Production and Industrial, Institut Teknologi Sumatera, South Lampung, Indonesia.

Referensi

Aguilar-Escobar, V. G., Garrido-Vega, P., Majado-Márquez, J., & Camuñez-Ruiz, J.-A. (2021). Hotel room cleaning: Time study and analysis of influential variables in a Spanish hotel. Journal of Industrial Engineering and Management, 14(3), 645–660. https://doi.org/10.3926/jiem.3441

Duran, C., Cetindere, A., & Aksu, Y. E. (2015). Productivity Improvement by Work and Time Study Technique for Earth Energy-glass Manufacturing Company. Procedia Economics and Finance, 26, 109–113. https://doi.org/10.1016/S2212-5671(15)00887-4

Febriana, N. V., Lestari, E. R., & Anggarini, S. (2015). Analisis Pengukuran Waktu Kerja Dengan Metode Pengukuran Kerja Secara Tidak Langsung Pada Bagian Pengemasan Di PT JAPFA COMFEED INDONESIA TBK. Jurnal Industri, 4(1), 66–73.

Harrianto, R. (2010). Buku Ajar Kesehatan Kerja. EGC.

Herjanto, E. (2008). Manajemen Operasi (Ketiga). Gramedia.

Hilbert, G., Gruson, D., Vargas, F., Valentino, R., Chene, G., Boiron, J.-M., Pigneux, A., Reiffers, J., Gbikpi-Benissan, G., & Cardinaud, J.-P. (2000). Noninvasive continuous positive airway pressure in neutropenic patients with acute respiratory failure requiring intensive care unit admission. Critical Care Medicine, 28(9), 3185–3190. https://doi.org/10.1097/00003246-200009000-00012

Houshyar, E., & Kim, I.-J. (2018). Understanding musculoskeletal disorders among Iranian apple harvesting laborers: Ergonomic and stop watch time studies. International Journal of Industrial Ergonomics, 67, 32–40. https://doi.org/10.1016/j.ergon.2018.04.007

Makapedua, J., & Tannady, H. (2016). Analisis Pengukuran Waktu Kerja Operator Dan Usulan Perbaikan Dengan Work Sampling (Studi Kasus: Mcdonald’S Hayam Wuruk). Teknik Industri Dan Ilmu Komputer, 19(05), 295–304.

Miranda, S., & Tripiawan, W. (2019). Perbandingan Penentuan Waktu Baku Menggunakan Metode Time Study dan Critical Path Method (CPM). Jurnal Sistem Dan Manajemen Industri, 3(1), 19–30. https://doi.org/10.30656/jsmi.v3i1.1418

Permana, W. D., Bayhaqi, I., & Handayani, C. (2022). Perancangan Operation Process Chart Dan Pengukuran Waktu Baku Dengan Metode Stopwatch Time. JuTMI: Jurnal Teknik Mesin Dan Industri, 1(1), 5–13.

Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Kerja dengan Stopwatch Time Study untuk Meningkatkan Target Produksi di PT. XYZ. JUMINTEN. https://doi.org/10.33005/juminten.v2i1.217

Rafian, M. A., & Muhsin, A. (2017). Analisis Beban Kerja Mekanik pada Departemen Plant dengan Metode Work Sampling (Studi Kasus pada PT XYZ). OPSI, 10(1), 35–42. https://doi.org/10.31315/opsi.v10i1.2165

Rizani, N. C., Safitri, D. M., & Wulandari, P. A. (2017). Perbandingan Pengukuran Waktu Baku dengan Metode Stopwatch Time Study dan Metode Ready Work Factor (RWF) pada Departemen Hand Insert PT. Sharp Indonesia. Jurnal Teknik Industri, 2(2), 127–136.

Sabrini, A., Rambe, J., & Wahyuni, D. (2013). Pengukuran Beban Kerja Karyawan Dengan Menggunakan Metode Swat (Subjective Workload Assessment Technique) Dan Work Sampling Di Pt. Xyz. Jurnal Teknik Industri FT USU, 8(2), 6–13.

Sutalaksan, I., Anggawisastra, R., & Tjakraatmadja, J. (1979). Teknik tata cara kerja. Bandung: ITB Press.

Diterbitkan

2023-08-27

Cara Mengutip

1.
Utama DA, Nugraha AT, Wahyudi R. Penentuan Waktu Baku Optimal dan Analisis Beban Kerja Pada Bagian Produksi Udang PCDTO-IQF di PT. Indo American Seafoods. Pasti [Internet]. 27 Agustus 2023 [dikutip 28 Mei 2026];17(2):150-63. Tersedia pada: https://training-ojs3-publikasi.mercubuana.ac.id/index.php/pasti/article/view/17660