Analysis of Total Productive Maintenance Using Overall Resource Effectiveness (ORE) Methods on Pellet Mill 3 Machine in PT. XYZ
DOI:
https://doi.org/10.22441/ijiem.v4i3.21478Kata Kunci:
Total productive maintenance, Overall resource effectiveness, Pellet millAbstrak
Pellet Mill is a critical machine in producing animal feed in pellets and crumbles at PT XYZ. In the production process, PT XYZ has three pellet mill machines actively operating, with the highest indication of breakdown time on pellet mill machine 3. This high breakdown time affects the productivity and effectiveness of the related machines. In this research focuses on knowing the effectiveness value of the pellet mill 3 machines using the Overall Resource Effectiveness (ORE) method and determining the factors that affect the effectiveness value. From these factors, improvement recommendations are then given based on total productive maintenance (TPM) concept to maintain and increase the effective value of the pellet mill 3 machine. Based on the calculation results using the Overall Resource Effectiveness (ORE) method for the pellet mill 3 machine, the effectiveness value is 71.41%, below the Japan Institute of Plant Maintenance (JIPM) standard of 85%. The factor that causes the low ORE is power efficiency, which averages 81.71%. To increase The ORE value of the pellet mill 3 machine, the pillars of total productive maintenance applied 5S, autonomous maintenance, planned maintenance, focussed improvement, Early Equipment Management, Training and Education, Quality Maintenance, and also the safety health environment.Unduhan
Referensi
Aprina, B. (2019). ANALISA OVERALL RESOURCE EFFECTIVENESS UNTUK MENINGKATKAN DAYA SAING DAN OPERATIONAL EXCELLENCE Pasar konstruksi dan sektor bahan bangunan Indonesia telah berkembang secara signifikan , didorong oleh pesatnya. JITMI (Jurnal Ilmiah Teknik Dan Manajemen Industri), 2.
Baety, R., Budiasih, E., Tatas, F., Atmaji, D., Industri, F. R., Telkom, U., & Big, S. (2019). PENERAPAN TOTAL PRODUCTIVE MAINTENANCE ( TPM ) DALAM BOTTLENECK AUTO-PART MACHINING LINE MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS ( OEE ) APPLICATION OF TOTAL PRODUCTIVE MAINTENANCE ( TPM ) IN BOTTLENECK AUTO-PART MACHINING LINE USING OVERALL EQ.
Basak, S., Baumers, M., Holweg, M., Hague, R., & Tuck, C. (2022). Reducing production losses in additive manufacturing using overall equipment effectiveness. Additive Manufacturing, 56(January), 102904. https://doi.org/10.1016/j.addma.2022.102904
Dawood, L. M., & Abdullah, Z. H. (2018). Study Impact of Overall Equipment and Resource Effectiveness onto Cement Industry. Journal of University of Babylon 26(3), 187-198. https://www.journalofbabylon.com/index.php/JUBES/article/view/1117
Erlin, M. N., Susetyo, A. E., & Ma’arif, S. (2022). Effectiveness Analysis of Pelletizer Machine Using Overall Resource Effectiveness (ORE) and Failure Mode and Effect Analysis (FMEA) Methods at PT Multi Energi Biomassa. Interbational Conference on Sustainable Engineering and Technology, 143–154.
Fauzi, H., Alhilman, J., Tatas, F., & Atmaji, D. (2021). Analisis Penerapan Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE) Dalam Mengevaluasi Efektivitas Mesin CNC Millac Di PT Dirgantara Indonesia. E-Proceeding of Engineering, 8(2), 2107.
Maulana, F. E., Atmaji, F. T. D., & Pamoso, A. (2020). Usulan Penerapan Total Productive Maintenance (TPM) Office Menggunakan Overall Resource Equipment (ORE) Untuk Mesin Air Jet Loom (AJL). 13–18.
Nurprihatin, F., Angely, M., & Tannady, H. (2019). Total Productive Maintenance Policy to Increase Effectiveness and Maintenance Performance Using Overall Equipment Effectiveness. 6(3), 184–199. https://doi.org/10.22105/jarie.2019.199037.1104
Puspita, L. E., & Widjajati, E. P. (2021). Pengukuran Efektivitas Mesin Latexing Pada Produksi Karpet Permadani Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Di Pt. Xyz. Juminten, 2(4), 1–12. https://doi.org/10.33005/juminten.v2i4.295
Putra, S. S. W., & Rahmawati, B. D. (2022). Raw Mill Machine Effectiveness Measurement through the Total Productive Maintenance (TPM) Implementation. Opsi, 15(2), 153. https://doi.org/10.31315/opsi.v15i1.7729
Ramadhan, F. N., Budiasih, E., & Pamoso, A. (2021). Evaluasi Efektivitas Pemanfaatan Mesin Cnc Hurco Dengan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Evaluation of the Effectiveness of Utilizing Hurco Cnc Machine With Overall Equipment Effectiveness (Oee) and Ove. 8(5), 7048–7057.
San, S. (2021). A Systematic Literature Review of Total Productive Maintenance On Industries. Performa: Media Ilmiah Teknik Industri, 20(2), 97. https://doi.org/10.20961/performa.20.2.50087
Setiawan, I. (2021). Integration of total productive maintenance and industry 4.0 to increase the productivity of nc bore machines in the musical instrument industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, March, 4701–4711.
Tammya, E., & Herwanto, D. (2021). Analisis Efektivitas Mesin Debarker Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) Di PT. XYZ Kuningan, Jawa Barat. SITEKIN: Jurnal Sains, Teknologi Dan Industri, 19(1), 20–27.
Tiara, D. P., Rosmadenis, P. S., & Wahyudin, W. (2023). Analisis Pemeliharaan Mesin Pulper Menggunakan Metode Total Productive Maintenance dengan Pendekatan Overall Equipment Effectiveness di Kedai Kopi Aceng. VIII(2), 5191–5196.
Wardani, I. K., Tatas, F., Atmaji, D., & Alhilman, J. (2020). An Autonomous Maintenance Design Based on Overall Resource Effectiveness ( ORE ) Analysis : A Case Study of Paving Molding Machine. 6869. https://doi.org/10.23917/jiti.v20i2.15627
Zulfatri, M. M., Alhilman, J., & Atmaji, F. T. D. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Pada Mesin Pl1250 Di Pt Xzy. JISI: Jurnal Integrasi Sistem Industri, 7(2), 123. https://doi.org/10.24853/jisi.7.2.123-131
(Aprina, 2019),(Baety et al., 2019),(Basak et al., 2022)(Fauzi et al., 2021)(Nurprihatin et al., 2019)(Putra & Rahmawati, 2022) (Tammya,2021),(Wardani, 2020),
(Erlin,2022),(Maulana et al., 2020)
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.