Analysis of Green Supply Chain Management Performance Measurement in the Tofu Processing Industry (Case Study: Kampung Tahu-Tempe Selili)
DOI:
https://doi.org/10.22441/ijiem.v4i3.21598Keywords:
Green manufacturing, GreenSCOR, Analytical hierarchy process, Snorm de Boer, Traffic light systemAbstract
Kampung Tahu-Tempe Selili is one of the industrial areas in Samarinda City that produces tofu and tempeh. In the production activities of this area, waste is still dumped into the Mahakam River. The problems include improper raw material sourcing, pollution that disturbs the surrounding residents due to the production process, lack of waste management, and the presence of defective tofu either after production or during delivery to consumers. The research Objective is to improve the supply chain activities using the Green Manufacturing approach. This study utilizes the Green Supply Chain Operations Reference (GreenSCOR) model with a focus on the production process. There are 8 Green Objectives with 15 Key Performance Indicators (KPIs) that will be weighted for each KPI using the Analytical Hierarchy Process (AHP) method. Furthermore, data on the actual realization values of the KPIs are collected from 25 factories located in Kampung Tahu-Tempe Selili. The calculation is performed using the Snorm de Boer method to normalize the actual data, and the Traffic Light System (TLS) method is used to categorize the KPI performance. Based on the calculation of weights and normalization values, the performance score of Kampung Tahu-Tempe Selili is 69.85, KPIs MR-03 and MR-04 are problems faced by all factories and are categorized as red. Factory conditions that cannot treat liquid waste and waste in water use, so that steps that can be taken by the factory reuse residual water for needs that do not involve direct contact with food which can reduce water demand. Then work with the local government to build a waste end treatment plant which can later be processed into alternative biogas fuel.Downloads
References
Dinas Perindustrian, Perdagangan, Koperasi, Usaha Kecil Dan Menengah Kalimantan Timur. (2022). Sentra Industri Kecil Menengah Somber. [Online], Available On: https://indagkop.kaltimprov.go.id/halaman/detail/sentra-industri-kecil-menengah-somber
Central Bureau of Statistics. (2022) Profil Industri Mikro dan Kecil 2020.
Fathimahhayati, L. D., Amelia, T., & Syeha, A. N. (2019). Analisis Beban Kerja Fisiologi pada Proses Pembuatan Tahu Berdasarkan Konsumsi Energi (Studi Kasus: UD. Lancar Abadi Samarinda). Jurnal INTECH Teknik Industri Universitas Serang Raya, 5(2), 100–106. https://doi.org/10.30656/intech.v5i2.1695
Hairiyah, N., & Amalia, R. (2020). PENGENDALIAN KUALITAS PRODUK TAHU MENGGUNAKAN METODE SIX SIGMA DI UD. SUMBER URIP. AGROINTEK, 14, 14–23. https://doi.org/10.21107/agrointek.v14i1.5222
Jannah, B., Ridwan, A. Y., & Hadi, R. M. El. (2018). Designing the Measurement of System Green Manufacturing Using SCOR Model in The Leather Tanning Industry. Jurnal Rekayasa Sistem & Industri (JRSI), 5(02), 60. https://doi.org/10.25124/jrsi.v5i01.301
Jaya, J. D., Ariyani, L., & Hadijah, H. (2019). DESIGNING CLEAN PRODUCTION OF TOFU PROCESSING INDUSTRY IN UD. SUMBER URIP PELAIHARI. Jurnal Agroindustri, 8(2), 105–112. https://doi.org/10.31186/j.agroind.8.2.105-112
Jawad, A,M., Baihaqi, I., dan Ardiantono, D.S. (2019).Analisis dan Perbaikan Kinerja Green Supply Chain Management Perusahaan (Studi Kasus: Joint Operating Body Pertamina-Petrochina East Java), JURNAL TEKNIK ITS Vol. 8, No. 1, (2019) ISSN: 2337-3539 (2301-9271 Print).
Ministry of National Development Planning, (2022), Sekilas Sdgs, [Online], Available On: Https://Sdgs.Bappenas.Go.Id/Sekilas-Sdgs/
Novita, E., Marxoni, E., & Welly, W. (2021). PENGUKURAN KINERJA DENGAN METODE PERFORMANCE PRISM. Inaque : Journal of Industrial and Quality Engineering, 9(1), 49–61. https://doi.org/10.34010/iqe.v9i1.4307
Primadasa, R., & Sokhibi, A. (2020). MODEL GREEN SCOR UNTUK PENGUKURAN KINERJA GREEN SUPPLY CHAIN MANAGEMENT (GSCM) INDUSTRI KELAPA SAWIT DI INDONESIA. Quantum Teknika : Jurnal Teknik Mesin Terapan, 1(2). https://doi.org/10.18196/jqt.010209
Pujawan, I. N., dan Mahendrawathi. (2017) Supply Chain Management Edisi 3, Yogyakarta: Penerbit ANDI.
Pujianto, T., Bunyamin, A., & Wafiyyah, S. (2022). Pengukuran kinerja green manufacturing pada industri tahu sumedang untuk meningkatkan kinerja terhadap lingkungan menggunakan GSCOR dan LCA. Agrointek : Jurnal Teknologi Industri Pertanian, 16(2), 221–233. https://doi.org/10.21107/agrointek.v16i2.10831
Putri, B., Putu Suparthana, I., & Darmayanti, L. P. (2021). Itepa: Jurnal Ilmu dan Teknologi Pangan, The Effect of The Duration of Boiling Soybeans on The Characteristics of Fermented Soybeans. Itepa: Jurnal Ilmu dan Teknologi Pangan, , 492–504.
Rahmi Yuniarti, Ishardita P. Tama., Agustina E., dan Yeni, S. (2018). Green Supply Chain Management dan Studi Kasus di Dunia Industri, UB Press : Malang.
Regita Irvastava P., Imam Baihaqi, dan Geodita, B. (2020). Membangun Green Supply Chain Management (GSCM) Scorecard, JURNAL TEKNIK ITS Vol. 9, No. 2, (2020) ISSN: 2337-3539 (2301-9271 Print).
Satriono, B., Profita, A., & Djumiati Sitania, F. (2020). Perancangan dan Pengukuran Kinerja Perusahaan Berbasis Kerangka Agri-Food Supply Chain. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6, 123–131. https://doi.org/10.30656/intech.v6i2.2405
Setiyadi, A., & Dwi Agustia, R. (2018). PENERAPAN METODE AHP DALAM MEMILIH MARKETPLACE E-COMMERCE BERDASARKAN SOFTWARE QUALITY AND EVALUATION ISO/IEC 9126-4 UNTUK UMKM.
Sirajuddin, dan Harjanto .(2018). Pengaruh Ukuran Adsorben dan Waktu Adsorpsi Terhadap Penurunan Kadar COD pada Limbah Cair Tahu Menggunakan Arang Aktif Tempurung Kelapa, Prosiding (SNP2M), ISBN : 978-602-607766-4-9, Politeknik Negeri Samarinda
Suhairin, S., Muanah, M., & Dewi, E. (2020). PENGOLAHAN LIMBAH CAIR TAHU MENJADI PUPUK ORGANIK CAIR DI LOMBOK TENGAH NTB. SELAPARANG Jurnal Pengabdian Masyarakat Berkemajuan, 4, 374. https://doi.org/10.31764/jpmb.v4i1.3144
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









