Analysis of Value Stream Mapping (VSM) in the Application of Lean Manufacturing to Minimize Waste at PT. Karya Indah Medika
DOI:
https://doi.org/10.22441/ijiem.v5i1.22395Keywords:
Waste, Lean manufacturing, Value stream mapping, Current value stream mapping, Future value stream mappingAbstract
Achievements to minimize waste can be done by adopting a Lean manufacturing approach. Lean manufacturing is a concept that can design production processes to be better, faster, and cheaper with minimal space, small inventory, small labor hours, and avoid waste. This research takes the case study of PT Karya Indah Medika which is a company engaged in manufacturing to produce medical devices, medical device service services, and medical device installation. In the company there is still waste, especially in unnecessary movements and product defects. This study aims to identify waste that occurs in the company and provide recommendations for improvements in order to minimize waste and obtain optimal production time. Value stream mapping is used to describe all processes in the company. The results showed that the initial production time of 17 hours 18 minutes could be reduced to 1 hour 55 minutes. Based on the Failure Mode and Effect Analysis (FMEA) it is known that the root cause of the problem in the highest waste is workers in a hurry so they are not thorough in working with a Risk Priority Number (RPN) score of 294, lack of materials needed for production, placement of tools that are not in accordance with production needs and a warehouse area that is less extensive by 216.Downloads
References
Afrianto, M., Budiharti, N., & Haryanto, S. (2022). Implementasi Lean Manufacturing untuk Meminimasi Waste Menggunakan Metode Value Stream Mapping di PT. MJ Di Pasuruan. Jurnal Valtech, 5(2), 74–80. https://doi.org/10.37631/jri.v4i2.560
Ardiansyah Odi, Akhmad Nidhomuz Zaman, Siti Rohana Nasution, & Sambas Sundana. (2019). Analisis Pengurangan Waste Pada Proses Perawatan Kereta. Jurnal ASIIMETRIK 1(1), 34–42. https://doi.org/10.35814/asiimetrik.v1i1.220
Donoriyanto, D. S., Falah, Y., & Azhar, M. F. (2020). Analisis Waste Pada Aktivitas Lini Produksi Dengan Menggunakan Lean Manufacturing di PT ABC. Tekmapro, 15(1), 25–35. https://doi.org/10.33005/tekmapro.v15i1.129
Isnain, S. K., & Karningsih, P. D. (2020). Perancangan Perbaikan Proses Produksi Komponen Bodi Mobil Daihatsu dengan Lean Manufacturing di PT. “XYZ.” Jurnal Studi Manajemen dan Bisnis, 5(2), 122–129. https://doi.org/10.21107/jsmb.v5i2.6667
Jannah, M., & Siswanti, D. (2018). Analisis penerapan Lean Manufacturing untuk Mereduksi Overproduction waste menggunakan value stream mapping dan fishbone diagram. Jurnal Teknik, 6(1), 254–265.
Ma’ruf, Z., Marlyana, N., & Sugiyono, A. (2021). Analisis Penerapan Lean Manufacturing dengan Metode Valsat untuk Memaksimalkan Produktivitas pada Proses Operasi Crusher ( Studi kasus di PT Semen Gresik Pabrik Rembang ). Prosiding Sem. Nas. Konstelasi Ilmiah Mahasiswa UNISSULA 5 (KIMU 5), 5(1), 10–20.
Novitasari, R., & Iftadi, I. (2020). Analisis Lean Manufacturing untuk Minimasi Waste pada Proses Door PU. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 65–74. https://doi.org/10.30656/intech.v6i1.2045
Riyadi, M. 2020. Pengendalian Produksi di Industri Galangan. Sukabumi: CV Jejak (Jejak Publisher).
Satria, T. (2018). Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model (WAM) dan VALSAT untuk Meminimumkan Waste (Studi Kasus: PT. XYZ). JRSI. 7(1), 55. https://doi.org/10.26593/jrsi.v7i1.2828.55-63
Sutharsan, S. M., Mohan Prasad, M., & Vijay, S. (2020). Productivity enhancement and waste management through lean philosophy in Indian manufacturing industry. Materials Today: Proceedings, 33, 2981–2985. https://doi.org/10.1016/j.matpr.2020.02.976
Taufik, D. A., & Fahturizal, I. M. (2021). Value Stream Mapping (VSM) Implementation as an Effort to Reduce Delays in the Procurement Process at PT DI. IJIEM - Indonesian Journal of Industrial Engineering and Management, 2(3), 198. https://doi.org/10.22441/ijiem.v2i3.11875
Trimarjoko, A., Fathurohman, D. M. H., & Suwandi, S. (2020). Metode Value Stream Mapping dan Six Sigma untuk Perbaikan Kualitas Layanan Industri di Automotive Services Indonesia. IJIEM - Indonesian Journal of Industrial Engineering and Management, 1(2), 91. https://doi.org/10.22441/ijiem.v1i2.8873
Zakaria, M. I., & Rochmoeljati, R. (2020). Analisis Waste Pada Aktivitas Produksi Bta Sk 32 Dengan Menggunakan Lean Manufacturing Di Pt Xyz. JUMINTEN, 1(2), 45–56.
Zulfikar, A. M., & Rachman, T. (2020). Penerapan Value Stream Mapping Dan Process Activity Mapping Untuk Identifikasi Dan Minimasi 7 Waste Pada Proses Produksi Sepatu X di PT. Pai. Jurnal Inovisi, 16, 13–24.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.