Measurement of Line Balancing in the Production Process Copper Cathode at PT. Smelting Using Ranked Positional Weight (RPW) Method

Authors

  • Muhammad Donny Putra Wardana Department of Industrial Engineering, Faculty of Engineering and Sains, Universitas Pembangunan Nasional Veteran Jawa Timur, Jl. Rungkut Madya, Gunung Anyar, Surabaya 60294
  • Joumil Aidil Saifuddin Department of Industrial Engineering, Faculty of Engineering and Sains, Universitas Pembangunan Nasional Veteran Jawa Timur, Jl. Rungkut Madya, Gunung Anyar, Surabaya 60294

DOI:

https://doi.org/10.22441/ijiem.v5i3.23322

Keywords:

Line, Balancing, Rank positional weight, Workstation

Abstract

Line balancing is required in the production process. Without a balanced production line at work stations, the production process is less effective and efficient. Refinery at PT. Smelting has a type of mass production process, so it is planned to determine the optimal production line so that the loading on each work station will be more evenly distributed and reduce idle time. The method used is the measurement of working time with a stop watch. the data used is the work element and the time needed by the operator to complete the copper cathode production process which is from the anode arriving at the Anode Preparation Machine (APM) until the copper cathode is finished strapping at the Cathode Washing & Stripping Machine (CWSM). There are two results of the analysis,based on the first analysis that by using the line balancing method, the company can achieve a line efficiency of 78.10% and reduce the balance delay by 15.11% which is from 37.01% to 21.90%.

Downloads

Download data is not yet available.

References

Agustina, M. M. (2020). Pengaruh Penerapan Stasiun Kerja Dan Postur Kerja Ergonomi Terhadap Kepuasan Kerja Pegawai Di Perpustakaan Universitas Brawijaya (Doctoral dissertation, UNIVERSITAS AIRLANGGA).

Aripin, W. T., & Kurniawan, A. (2019). Analisis Keseimbangan Lintasan di PT. Cibuniwangi Gunung Satria. Jurnal Industrial Galuh, 1(02), 48-58. https://doi.org/10.25157/jig.v1i02.2988

Basuki, M., Hermanto, M. Z., Aprilyanti, S., & Junaidi, M. (2019). Perancangan Sistem Keseimbangan Lintasan Produksi dengan Pendekatan Metode Heuristik. Jurnal Teknologi, 11(2), 117-126. https://doi.org/10.24853/jurtek.11.2.117-126

Cahyawati, A. N. (2019). Analisis pengukuran kerja dengan menggunakan metode stopwatch time study. Prosiding SENTRA (Seminar Teknologi dan Rekayasa), 4, 106-112.

Dharmayanti, I., & Marliansyah, H. (2019). Perhitungan Efektifitas Lintasan Produksi Menggunakan Metode Line Balancing. Jurnal Manajemen Industri dan Logistik, 3(1), 43-54. https://doi.org/10.30988/jmil.v3i1.63

Fenny Novianti., Rr. Rochmoeljati (2023). Quality Control of Edamame Products Using Statistical Quality Control (SQC) and Failure Mode Effect Analysis (FMEA) Methods in PT. XYZ. Indonesian Journal of Industrial Engineering & Management, 4(2), 221-230. http://dx.doi.org/10.22441/ijiem.v4i2.20550

Fitriana, R., & Zanah, L. (2020). Pengaruh Pengendalian Internal Persediaan Bahan Baku dan Perencanaan Proses Produksi Terhadap Kelancaran Proses Produksi Pada PT. Daliatex Kusuma. Akurat: Jurnal Ilmiah Akuntansi FE UNIBBA, 11(3), 93-114. http://ejournal.unibba.ac.id/index.php/AKURAT

Hapid, Y., & Supriyadi, S. (2021). Optimalisasi Keseimbangan Lintasan Produksi Daur Ulang Plastik dengan Pendekatan Ranked Positional Weight. Jurnal INTECH Teknik Industri Universitas Serang Raya, 7(1), 63-70. https://doi.org/10.30656/intech.v7i1.3305

Kusuma, T. Y. T., & Firdaus, M. F. S. (2019). Penentuan Jumlah Tenaga Kerja Optimal untuk Peningkatan Produktifitas Kerja (Studi Kasus: UD. Rekayasa Wangdi W). Integrated Lab Journal, 7(2), 26-36. https://core.ac.uk/download/pdf/270289797.pdf

Matiro, M. A. D., Mau, R. S., Rasyid, A., & Rauf, F. A. (2021). Pengukuran Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Pada Divisi Proses PT. Delta Subur Permai. Jambura Industrial Review (JIREV), 1(1), 30-39. https://doi.org/10.37905/jirev.v1i1.7774

Meyers, F. E., & Stewart, J. R. (2002). Motion and time study for lean manufacturing. Upper Saddle River, N.J: Prentice Hall.

Mustofa, A. Z., & Priyasmanu, T. (2021). Perancangan Ulang Alat Pengaduk Sabun Cair pada Pengatur Kecepatan. Jurnal Valtech, 4(2), 261-269. https://eprints.itn.ac.id/4101/15/JURNAL%20HARYONO%20-%202019.pdf

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Jurnal Pendidikan dan Aplikasi Industri (UNISTEK), 7(2), 93-97. https://doi.org/10.33592/unistek.v7i2.650

Rahma, C., Ariska, A., & Afriasari, V. (2019). Optimalisasi Pelayanan Unit BPJS RSUD Melalui Perhitungan Waktu Siklus Operator Pelayanan SEP. Jurnal Optimalisasi, 4(1), 11-20. https://doi.org/10.35308/jopt.v4i1.1278

Sumasto, F., Nugroho, Y. A., Purwojatmiko, B. H., Wirandi, M., Imansuri, F., & Aisyah, S. (2023). Implementation of Measurement System Analysis to Reduce Measurement Process Failures on Part Reinf BK6. Indonesian Journal of Industrial Engineering & Management.

Trenggonowati, Dyah. 2019. Mengukur Efisiensi Lintasan dan Stasiun Kerja Menggunakan Metode Line Balancing Studi Kasus PT XYZ. Jurnal Industrial Services, 4(2), 97-105. http://dx.doi.org/10.36055/jiss.v4i2.5158

Downloads

Published

2025-03-20

How to Cite

1.
Wardana MDP, Saifuddin JA. Measurement of Line Balancing in the Production Process Copper Cathode at PT. Smelting Using Ranked Positional Weight (RPW) Method. IJIEM [Internet]. 2025 Mar. 20 [cited 2026 May 29];5(3):726-35. Available from: https://training-ojs3-publikasi.mercubuana.ac.id/index.php/ijiem/article/view/23322

Issue

Section

Articles

Similar Articles

1 2 3 4 > >> 

You may also start an advanced similarity search for this article.