Preventive Maintenance Analysis to Improve the Readiness of Heavy Equipment Hydraulic Excavator Liebherr R9250 & R9350 with Six Sigma Method at PT. XYZ
DOI:
https://doi.org/10.22441/ijiem.v5i3.22917Keywords:
Six sigma, DMAIC, Preventive analysis, Mining, ExcavatorAbstract
PT. XYZ is a company in the field of coal mining. The mining production process is carried out by open pit mining, meaning open mining. One of the activities carried out in the production process at PT. XYZ is overburden removal. The excavator used for overburden removal consists of 2 types Liebherr R9250 and R9350. Based on an initial survey, a breakdown occurred on the Liebherr R9250 excavator engine, experiencing a lubrication system failure, and the R9350 experienced a cooling system failure, so the engine was stuck. The purpose of this research is to overcome the problem of unscheduled unit breakdowns on Liebherr R9250 and R9350 hydraulic excavators at the coal mine project PT. XYZ using the Six Sigma method by formulating Define, Measure, Analyze, Improve, Control (DMAIC) that occurs. The results showed that the R9250 and R9350 excavators at the Six Sigma achievement level were in the 1-Sigma category or at the lowest level, with a very uncompetitive description of the quality of the unit's readiness during the production process. This shows that better improvement is needed to support the quality of unit readiness. Based on this research, the recommendations that can be given are that the company needs to improve human resources, monitor spare parts stock, implement maintenance methods, and improve the quality of unit readiness, operation of tools, customizing spare parts specifications, and provision of company facilities.Downloads
References
Adrianto, W., & Kholil, M. (2016). Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA). Jurnal Optimasi Sistem Industri, 14(2), 299. https://doi.org/10.25077/josi.v14.n2.p299-309.2015
Arsyad, M., & Sultan, A. Z. (2018). Manajemen Perawatan (p. 146). Deepublish.
Herlambang, H. (2020). Six Sigma Implementation in Connector and Terminals Manufacturing Company: A Case Study. IJIEM (Indonesian Journals of Industrial Engineering and Management), 1(1), 1–11. https://doi.org/10.22441/ijiem.v1i1
Gaspersz, V. (2002). Pedoman Implementasi Program Six Sigma Terintegrasi dengan ISO 9001:2000, MBNQA, dan HACCP. Gramedia Pustaka Utama.
Indrasari, M. (2019). Pemasaran dan Kepuasan Pelanggan. Unitomo Press.
Kurniawan, W., Sugiarto, D., & Saputera, R. (2018). Usulan Penerapan Metode Six Sigma untuk Meningkatkan Mutu Crude Palm Oil (Cpo) di PT. X. Jurnal Ilmiah Teknik Industri, 5(2). https://doi.org/10.24912/.v5i2.1817
Pahlevie, R. R., Mubarak, M., & Fachrurrazi, F. (2021). Kajian Faktor yang di Pertimbangkan dalam Penyediaan Alat Berat Excavator di Kota Banda Aceh. Konferensi Nasional Teknik Sipil (KONTEKS) 15: Semarang, Indonesia, 310-317.
Putra, G. M. P., & Irawan, A. (2020). Analisis Pemeliharaan Preventif AC Package pada Gerbong Kereta Penumpang K1 Di Depo 2 Gerbong Kereta Bandung. GEMA : Jurnal Gentiaras Manajemen Dan Akuntansi, 12(1), 48–59. https://doi.org/10.47768/gema.v12i1.204
Rooney, J. J., & Heuvel, L. N. V. (2004, July). Root Cause Analysis For Beginners. Quality Progress, 45–53.
Sarwandy, M. H. A., & Royan, N. (2021). Produktivitas Alat Berat Excavator Backhoe pada Proyek Perumahan Al Zafa Tegal Binangun Kota Palembang. BEARING: Jurnal Penelitian Dan Kajian Teknik Sipil, 7(2), 121–125. https://doi.org/10.32502/jbearing.4211202172
Setiawati, K. L., Satriawan, I. K., & Yoga, I. W. G. S. (2020). Analisis Pengendalian Kualitas menggunakan Metode Six Sigma pada Produk Roti Tawar di PT. Ital Fran’s Multindo Food Industries Cabang Bali. Jurnal Rekayasa dan Manajemen Agroindustri, 8(4), 587. https://doi.org/10.24843/jrma.2020.v08.i04.p12
Sudrajat, A., & Megiyanto, G. (2020). Pedoman Praktis Manajemen Perawatan Mesin Industri (p. 116). Bandung: Refika Aditama.
Sulistyo, A. B., Zakaria, T., & Riyandi, R. (2019). Analisis Overall Equipment Effectiveness Mesin Vertical Roller Mill (Vrm) di PT. Cemindo Gemilang. Jurnal Industri dan Teknologi Terpadu, 2(1), 17–31. https://doi.org/10.47080/intent.v2i1.504
Trimarjoko, A., Fathurohman, D. M. H., & Suwandi, S. (2020). Metode Value Stream Mapping dan Six Sigma untuk Perbaikan Kualitas Layanan Industri di Automotive Services Indonesia. IJIEM (Indonesian Journals of Industrial Engineering and Management), 1(1), 991–104. https://doi.org/10.22441/ijiem.v1i1
Tripoli, B., Febrianti, D., & Musliadi Musliadi. (2018). Analisa Pemakaian Alat Berat Excavator Dengan Straight Line dan Reducing Charge Method. Jurnal Teknik Sipil dan Teknologi Konstruksi, 4(2), 82–91. https://doi.org/10.35308/jts-utu.v4i2.1989.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.