Risk-based predictive maintenance of medium voltage network switching equipment using analytical hierarchy process as an analytical tool

Penulis

  • Erick Satriyo Gumilang Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia
  • Chairul Hudaya Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia
  • Budi Sudiarto Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia
  • Faiz Husnayain Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia

DOI:

https://doi.org/10.22441/sinergi.2026.1.011

Kata Kunci:

Analytical hierarchy process, Monte Carlo, Risk management, Switching equipment, Z-score,

Abstrak

Predictive maintenance has become crucial for enhancing the reliability and efficiency of electrical systems, especially for Medium Voltage Network (MVN) switching equipment, which plays a key role in electricity distribution. This study aimed to develop a risk-based predictive maintenance model for MVN switching equipment using the Analytical Hierarchy Process (AHP) for maintenance prioritization, along with Z-score and Monte Carlo simulation methods to evaluate risk likelihood and impact. The Z-score method assessed the probability of risks occurring, revealing a probability exceeding 90% for specific equipment, such as UP2D.2025.C4, at 93.12%. The Monte Carlo simulation assessed the potential impact of these risks, showing severe consequences for various types of equipment. For example, UP2D.2025.C1 had a mean of 28.51 and a standard deviation of 3.50, while UP2D.2025.C8 had a standard deviation of 33.17, with an impact of over 61.53%. AHP was used to assign priority weights to components based on criteria such as equipment age, operational condition, and failure history. The analysis indicated that the Lightning Arrester had the highest maintenance priority at 26.04%, followed by the Fuse Cutout at 20.62% and the Pole-Mounted Circuit Breaker at 11.15%. This research was expected to significantly contribute to the development of more efficient and effective maintenance strategies for electrical systems, particularly in the electricity distribution sector.

Unduhan

Data unduhan belum tersedia.

Diterbitkan

2026-01-07

Cara Mengutip

[1]
E. S. Gumilang, C. Hudaya, B. Sudiarto, dan F. Husnayain, “Risk-based predictive maintenance of medium voltage network switching equipment using analytical hierarchy process as an analytical tool”, Sinergi, vol. 30, no. 1, hlm. 113–124, Jan 2026.

Terbitan

Bagian

Articles

Artikel Serupa

> >> 

Anda juga bisa Mulai pencarian similarity tingkat lanjut untuk artikel ini.