Proposed Total Productive Maintenance (TPM) Implementation to Increase Heading Machine Effectiveness Using Overall Equipment Effectiveness (OEE) Method on PT. XYZ
DOI:
https://doi.org/10.22441/ijiem.v5i2.23832Keywords:
TPM, OEE, Six big losses, Maintenance, Performance efficiencyAbstract
PT XYZ is one of the companies engaged in the precast concrete manufacturing industry which is specially designed to meet the needs of industrial markets such as high-quality building and building construction. The machine under study is the machine used for assembling the spun pile reinforcement frame in the rotary workshop. The purpose of this study is to analyze the application of Total Productive Maintenance (TPM) through the effectiveness and efficiency of heading machine performance and analyze the factors that affect the Overall Equipment Effectiveness (OEE) value and present a proposed heading machine maintenance strategy. The method used is OEE with Six Big Losses analysis. For the analysis of the six big losses on the OEE value, namely the value of Idle and minor stoppage (a decrease due to many machine stops) which is a factor that has the largest percentage of the six big losses with a resulting factor value of 7.0%. Then followed by reduced speed losses (decrease in engine speed) of 3.96% and then deffect losses of 3.48% and the three other factor values, namely breakdown losses, setup losses, and yield losses. Measurement of the level of effectiveness and efficiency of the heading machine at PT XYZ using the OEE method for the period 2022 in January - December obtained an average value of 78.28%. The resulting value is still far from the ideal OEE standard value of 85% which refers to the world class standard. The lowest OEE factor value is obtained from the calculation of Performance Efficiency of 86.29% where it is necessary to update the machine maintenance scheduling so as to increase the efficiency of the heading machine performance that supports the production speed of the company.Downloads
References
Andayati, D. (2019). Sistem Informasi Produksi Untuk Meningkatkan Kualitas Sistem Manufaktur Dan Jasa Dina. Jurnal Teknologi Dan Manajemen, 12(1), 87–92.
B. G. Sitompul, & D. I. Rinawati. (2019). Analisis Overall Equipment Effectiveness (Oee) Pada Mesin Digester Dan Pendekatan 5 Whys Untuk Perbaikan Pada PT Toba Pulp Lestari,Tbk. (Studi Kasus PT Toba Pulp Lestari,Tbk.). Industrial Engineering Online Journal, 8(1). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23258
Chair, R. D. (2022). Analisis Keefektifan Mesin Pellet 4 Menggunakan Metode Oee Dan Six Big Losses Di PT. Charoen Pokphand Indonesia. http://repository.upnjatim.ac.id/8395/
Dipa, M., Dewi Lestari, F., Faisal, M., & Fauzi, M. (2022). Analisis Overall Equipment Effectiveness (OEE) Dan Six Big Losses Pada Mesin Washing Vial di PT. XYZ. Junal Ilmiah Statistika Dan Ekonometrika, 2(1), 61–75. doi.org/10.46306/bay.v2i1.29
Haryono, S. (2019). Manajemen Produksi & Operasi. In Journal of Chemical Information and Modeling.
Marfinov, B. F. P. A., & Pratama, A. J. (2020). Overall Equipment Effectiveness (OEE) Analysis to Minimize Six Big Losses in Continuous Blanking Machine. IJIEM - Indonesian Journal of Industrial Engineering and Management, 1(1), 25. https://doi.org/10.22441/ijiem.v1i1.8037
Muhajir, S. M., & Yuamita, F. (2023). Analisis Total Productive Maintenance Dengan Menggunakan Metode Overall Equipment Effectiveness Pada Mesin Mixing Batching di PT. Wijaya Karya Beton Tbk Boyolali. Jurnal Inovasi Dan Kreativitas, 3(1), 9. https://doi.org/10.30656/jika.v3i1.6048
Nursanti, E., Avief, R. M. S., Sibut, & Kertaningtyas, M. (2019). Maintenance Capacity Planning. Dream Litera Buana.
Pranowo, I. D. (2019). Sistem dan Manajemen Pemeliharaan.
Rifandi, I. F. (2020). Analisis Pemeliharaan Mesin dengan Menggunakan Metode Preventive dan Breakdown Maintenance dalam Rangka Meminimumkan Biaya Pemeliharaan pada Mesin Boiler di Pabrik Gondorukem dan Terpentin Sindangwangi. Prosiding Manajemen, 544–548.
Setiawan, B., Latif, F. Al, & Rimawan, E. (2022). Overall Equipment Effectiveness ( OEE ) Analysis : A Case Study in the PVC Compound Industry. IJIEM (Indonesian Journal of Industrial Engineering & Management), 3(1), 14–25. http://dx.doi.org/10.22441/ijiem.v3i1.12066
Siddiq, M., Atmaji, F. T. D., & Alhilman, J. (2018). Usulan Penerapan Total Productive Maintenance (TPM) untuk Meningkatkan Efektivitas Mesin dengan Menggunakan Metode Overall Equipment Effectiveness (OEE). EProceedings 5(2), 2982-2990.
Simanjuntak, A. W. P. (2020). Studi Penerapan Total Productive Maintenance (TPM) Untuk Peningkatan Efisiensi Pada Pabrik Pupuk Organik PT. Agro Energi Indonesia.
Vianty, K. D. O., Hutabarat, J., & ST. Salmia L. A. (2022). Analisis Overall Equipment Effectiveness Untuk Meningkatkan Producktivitas Cup Filling Machine Melalui Pendekatan Six Big Losses. Jurnal Valtech (Jurnal Mahasiswa Teknik Industri), 5(1), 50–57. https://ejournal.itn.ac.id/index.php/valtech/article/view/4502
Wibisono, D. (2021). Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ). Jurnal Optimasi Teknik Industri (JOTI), 3(1), 7–13. https://doi.org/10.30998/joti.v3i1.6130
Widat, S., Awalina, D. N., & Mufidah, K. M. (2021). Analisis Kegiatan Pemeliharaan Mesin Dan Bangunan Pada Pabrik Tahu Untuk Meminimumkan Biaya Saat Pandemi Covid-19. JEPS: Journal of Economics and Policy Studies, 02(02), 63-74. https://doi.org/10.21274/jeps.v2i2.5350
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.