Analysis of Work Station Capacity Planning Efficiency in A Steel Fabrication Project Using the Theory of Constraints Method (TOC)
DOI:
https://doi.org/10.22441/ijiem.v6i2.30907Keywords:
Drum buffer rope, Fishbone diagram, Five-M analysis, Theory of constraintsAbstract
PT XYZ is a company engaged in steel fabrication, and there are several issues related to the production system of the PT Metso project that are known to be the source of bottlenecks at certain workstations, causing material flow on the production line to be impeded. This research will discuss the calculation of standard time and identify bottlenecks at several workstations. The application of the theory of constraints that can help identify and control the sources of constraints with several objectives such as maximizing throughput and creating detailed calculations of time buffers and Drum Buffer Rope maps to address issues. Then an analysis was conducted using a fishbone diagram and the Five-M Analysis method to determine the causes that occurred. Based on the calculations that have been made for the company's capacity and capability, a rescheduling of the Spray Bar production process has been carried out with an additional working time of 19 hours divided into 2.5 hours per working day. It is known that the bottleneck workstation is located at the Fit-up/Setting workstation with a percentage of 133%. To reduce this bottleneck, the company provides buffer time or time that serves as a cushion with the aim of protecting the production rate (throughput) Before the bottleneck workstation, it took 19.5 hours, and after the bottleneck workstation, it took 2.2 hours.Downloads
References
Ahadi, A. A. (2022). Penjadwalan Produksi Dengan Menggunakan Theory Of Constraint Pada Lini Produksi Tiang Pancang Bulat Di PT Wijaya Karya Beton Tbk. SIJIE Scientific Journal of Industrial Engineering, 3(2), 5–8. https://www.jim.unindra.ac.id/index.php/sijie/article/view/302%0Ahttps://www.jim.unindra.ac.id/index.php/sijie/article/download/302/1281
Ali, M. (2018). Manajemen Industri 4.0 (Pertama). UNY Press.
Aquilano, Nicholas J, Richard B, Chase and F Robert, Jacobs. (2004). Operation For Competitive Advantage, Six Edtition. Mc Grawhill. New York.
Dinni, F. (2020). Usulan Penjadwalan Produksi Menggunakan Pendekatan Theory Of Constraints Pada PT. XZY. Jurnal Indonesia Sosial Teknologi, 01(2), 305–322. https://doi.org/10.59141/jist.v1i02.17
Fajrah, N., Laila, W., Alfian, A., Hastarina, M., Wahyudi, B., Pratama, Y. D., Sunarni, T., Nasirly, R., Puji, A. A., Kusmindari, C. D., Harits, D., Arsi, F., Sari, R. K., Budiarto, Do., Afma, V. M., Wardah, S., Melliana, Lawi, A., Setiawan, H., & Zen, Z. H. (2023). Pengantar Teknik Industri. Penerbit Widina Media Utama.
Gaspersz, V. (2001). Production Planning & Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. Jakarta : Vincent Foundation dan PT Gramedia Pustaka Utama
Ginting, R. (2012). Penjadwalan Mesin. Yogyakarta: Graha Ilmu.
Heizer, J., Render, B., & Munson, C. (2017). Operations Management Sustainability and Supply Chain Management. https://ndupress.ndu.
Hidayat, T., Ulum, R. B., & Widarman, A. (2023). Rencanaan Kapasitas Produksi Pupuk Dengan Menggunakan Metode Rough Cut Capacity Planning (Rccp) Pada Pt.Pupuk Kujang. Jurnal Ilmiah Multidisiplin, 2(04), 153–161. https://doi.org/10.56127/jukim.v2i04.816
Novantoro, H., & Singgih, M. (2023). Analisis Beban Kerja Dan Penentuan Jumlah Karyawan Divisi Produksi Dalam Menyelesaikan Target Dari Perusahaan. Jurnal Taguchi: Jurnal Ilmiah, 1(3), 632-644. https://doi.org/10.46306/tgc.v3i1.116
Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study untuk Meningkatkan Target Produksi di PT. XYZ. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217
Prangawayu, N., Anto, F. J. L., & Simangunsong, J. Y. (2021). Analisis Kebutuhan Tenaga Kerja Optimal dengan Metode Work Load Analysis (WLA) pada Extruder Technician I di Departemen Produksi. Seminar Nasional Teknik Dan Manajemen Industri, 1(1), 120–127. https://doi.org/10.28932/sentekmi2021.v1i1.29
Purnomo, H., & Riani, L. P. (2018). Buku Optimasi Pengendalian Persediaan. In Hery Purnomo.
Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97. https://doi.org/10.33592/unistek.v7i2.650
Rahmawati, D., Puryani, & Nursubiyantoro, E. (2019). Optimalisasi Kapasitas Stasiun Kerja Dengan Penerapan Theory of Constraints (TOC). Jurnal Otimasi Sistem Industri, 12(1), 12. https://doi.org/10.31315/opsi.v12i1.2828
Riadi, E., & Suryati, A. (2023). Proses Penjadwalan Jangka Pendek Dengan Theory Constraint Asas Prioritas Bahan dan Alat yang Diproduksi Dalam Kegiatan Operasi Kamar Bedah di Rumah Sakit Umum Pekerja. Bussman Journal: Indonesian Journal of Business and Management, 3(2), 578–586. https://doi.org/10.53363/buss.v3i2.153
Rianti, H., Nafisah, L., & Nursubiyantoro, E. (2019). Pendekatan Theory of Constraints (Toc) Penjadwalan Flow Shop Pada Sistem Produksi Make To Order. Opsi, 12(1), 27. https://doi.org/10.31315/opsi.v12i1.2830
Rohman, A. S., & Muhammad, C. R. (2022). Peningkatan Throughput Garmen melalui Perbaikan Stasiun Kerja Bottleneck dengan Theory of Constraint. Jurnal Riset Teknik Industri, 2(2), 99–108. https://doi.org/10.29313/jrti.v2i2.1138
Saraswati D. (2016). Implementasi Theory of constraints Pada Upaya Peningkatan Kapasitas Produksi Olahan Bandeng. Bekasi. Teknik Industri. 3(6),208-213 https://doi.org/10.25105/JTI.V6I3.1545
Sekarningsih, P. E., & Hadining, A. F. (2022). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Pada Operator Mesin Broaching Dengan Metode Pengukuran Waktu Jam Henti (Studi Kasus: PT XYZ). Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, 8(2), 175. https://doi.org/10.24014/jti.v8i2.19936
Simangungsonga, T., & Sitompul, D. (2023). Penerapan Theory Of Constraint Pada Distrubusi Bahan Baku Kayu Pt. Toba Pulp Lestari, Tbk. Jurnal Teknita, 2(1), 56-52. http://jurnalteknik.usxiitapanuli.ac.id
Sproull, B. (2019). Theory of Constraints, Lean, and Six Sigma Improvement Methodology Makin the Case for Integration. Routledge/Productivity Press. https://publisher.uthm.edu.my/periodicals/index.php/rmtb/article/view/1993
Sudiantini, D., Irvana, N., Natalia, N., & Furqon, M. (2023). Strategi Penyesuaian Orientasi Pada Industri-Industri Manufaktur Kota Bekasi. Jurnal Ekonomi, Manajemen, dan Akuntansi, 1(1), 44-54 http://jurnal.anfa.co.id/index.php/mufakat
Sugiatna, A. (2021). Analisis Perencanaan Kapasitas Produksi Dengan Menggunakan Metoda Rought Cut Capacity Planning Pendekatan Cpof di PT. Xyz. Sistemik: Jurnal Ilmiah Nasional Bidang Ilmu Teknik, 9(02), 28–32. https://doi.org/10.53580/sistemik.v9i02.61
Suwandi, Muhammad, C. R., & Amaranti, R. (2022). Pengurangan Work In Process Inventory di Stasiun Kerja Bottleneck Menggunakan Pendekatan Theory Of Constraint (TOC). Bandung Conference Series: Industrial Engineering Science, 2(1), 133–140. https://doi.org/10.29313/bcsies.v2i1.1956
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.