Analisis kinerja turbin gas (GT 3.1) PLTGU Muarakarang setelah masa konstruksi sesuai ISO 2314:2009
DOI:
https://doi.org/10.22441/jonem.v1i1.14573Keywords:
Gas turbine, Performance test, Performance guarantee, acceptance test, net gt output, NPHRAbstract
PLN has determined the construction of the Muarakarang CCPP to balance the growth demand for electricity, which began in 2017 and has entered the testing phase in early 2020. Muarakarang CCPP uses gas turbines M701F5 manufactured by Mitsubishi Hitachi Power System with a net GT output of 341.300 kW, efficiency of 41.9% and a Net Plant Heat Rate of 2129 kCal/kWh. The problem is that due to differences in environmental conditions between the manufacturer and the project site, the delivery and transportation process as well as the assembly at the project site, there will be a deviation in the conditions of the operating parameters that cause changes in the performance of the gas turbine. So it is necessary to test the performance of the gas turbine after it is installed with quantitative and comparative research methods referring to the ISO standard: 2314 Gas Turbine Acceptance Test, which is to take the operating data directly at the same time and perform calculations with the input and output methods. The test results and calculations show that the net gt output is 345,721 kW, which is 4,421 kW higher than the manufacturer's design and performance guarantee, NPHR is obtained at 2,099.7 kcal/kWh, which is lower or more efficient by 29.3 kcal/kwh from the manufacturer's design and performance guarantee and the resulting efficiency is 41.9%, 1.6% higher than the manufacturer's design. This means that this gas turbine has met the performance guarantee and there is no damage during the delivery and installation process and the results of this calculation can be used as a reference for the next turbine performance evaluation.Downloads
References
PT. PLN (Persero), “Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2017 – 2026”, (2016). Jakarta: PT. PLN (Persero)
M. Faizal, Bambang T. P, Eriq S. E. (2017). Analisis Performance TM2500 Gas Turbine Generator Package pada Factory Test dan Site Test. Bina Teknika, 157-163.
Fikri, L, F. (2017). Analisa Perbandingan Kinerja Turbin gas PLTGU Unit 1.2 dan 1.3 Pada Beban 50 MW dan 100 MW. Surabaya: Institut Teknologi Sepuluh November.
Nadhifah, H, I. (2017). Kaji Kinerja Turbin gas Sebelum dan Sesudah Overhaul Combustion Inspection di GTG Utilitas I Pabrik PT. Petrokimia Gresik. Surabaya: Institut Teknologi Sepuluh November.
PLN. (2010). Komponen-Komponen PLTG. Jakarta: PLN Corporate University
Sunarwo, S., & Harijono M, T. (2016). Analisa Efisiensi Turbin gas Unit 1 Sebelum dan Setelah Overhaul Combustor Inspection di PT. PLN (Persero) Sektor Pembangkitan PLTGU Cilegon. Eksergi, 50-57.
Yuniarti, N. & Aji, I, W. (2019). Pembangkit Tenaga Listrik. Yogyakarta: Universitas Negeri Yogyakarta
Soekardi, C. (2015). Termodinamika Dasar Mesin Konversi Energi. Yogyakarta: Andi
Boyce, M. P. (2002). Gas Turbine Engineering Handbook. Houston: Butterworth-Heinemann.
Soares, C. (2015). Gas Turbines: A Handbook Of Air, land and Sea Aplication. Waltham: Butterworth-Heinemann.
Moran, M., Shapiro, H., Boettner, D., & Bailey, M. (2014). Fundamentals of Engineering Thermodynamics. Danver: Wiley
Biantoro, A. W, Kholil, M & Pranoto, H. (2019). Sistem Manajemen K3. Jakarta: Mitra Wacana Media
Mitsubishi Hitachi Power System. (2019). Design Manual Power Plant TPB-19058. Takasago: MHPS.
Mitsubishi Hitachi Power System. (2019). Operation Manual Power Plant TPB-19058. Takasago: MHPS.
Mitsubishi Hitachi Power System. (2019). PT PLN (Persero) Muarakarang CCPP Instruction of MHPS Gas Turbine Training Handbook. Takasago: MHPS.
Mitsubishi Electric Corporation, (2020). Generator System Description. Takasago: MELCO
Mitsubishi Hitachi Power System. (2019). Performance Test Prosedur For GT (Simple Cycle). Takasago: MHPS
PLN. (2016). Muarakarang CCPP (400-500 MW) Contract Document Schedule 6 Performance Guarantee. Jakarta: PT PLN (Persero)
ISO STANDARD. (2009). ISO 2314 Gas Turbines- Acceptance Test Third Edition.
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment. The Copyright Transfer Agreement (CTA) Form is able to download in CTA Form
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. Copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above-mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the author's personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.