Comparative Analysis of Repair Policy and Preventive Maintenance Policy Methods in Machine Maintenance on the Production Floor of PT. Metro Riau
DOI:
https://doi.org/10.22441/ijiem.v6i2.31177Kata Kunci:
Maintenance, Production machine, Printing, Preventive maintenance policy, Repair policyAbstrak
PT. Metro Riau is a newspaper printing company facing significant challenges due to high machine breakdown rates, which have impacted maintenance costs and production output. This study aims to compare machine maintenance costs using repair policy and preventive maintenance policy methods and provide recommendations for the most efficient maintenance approach. The data utilized includes types of breakdowns, maintenance costs, and production rates during the 2023 period. The research employs a quantitative analysis method to calculate repair and preventive maintenance costs based on the probability of breakdowns for each type of machine. The findings reveal that for type A breakdowns, the repair policy is more cost-effective, with a maintenance cost of IDR 143,829 compared to IDR 176,384 for the preventive maintenance policy. Conversely, for type B and C breakdowns, the preventive maintenance policy is more efficient, with costs of IDR 259,616 and IDR 375,950, respectively, compared to the repair policy. Based on these results, it is recommended to implement the repair policy for type A breakdowns and the preventive maintenance policy for types B and C. This combined approach is expected to reduce maintenance costs while enhancing the reliability of the company's production machinery.Unduhan
Referensi
Atikno, W., Wijaya, E. O., Setiawan, I., Susanto, R., & Kurnia, H. (2022). Analysis of BTA16 CNC Machine Performance Improvement with Total Productive Maintenance Approach. IJIEM - Indonesian Journal of Industrial Engineering and Management, 3(3), 200. https://doi.org/10.22441/ijiem.v3i3.15770
Azizah, N. B., Indriati, S., Widuri, R., & Shaferi, I. (2021). Analisis Repair Maintenance Policy Dan Preventive Maintenance Policy Untuk Meminimalkan Total Maintenance Cost Pada Mesin Pleating Pt Duta Nichirindo Pratama. Jurnal Ekonomi, Bisnis, Dan Akuntansi, 22(4), 404–420. https://doi.org/10.32424/jeba.v22i4.1765
Daniel, M. Y., Trismaya, N., Pardede, R. M., Handoko, A., Tinggi, S., & Interstudi, D. (2023). Perancangan Ulang Desain Website Cv. Multi Karya Indonesia Dengan Prototype User Interface (Ui) Sebagai Media Utama. 3(1), 455–474. https://doi.org/http://dx.doi.org/10.33376/jdes.v3i1.2107
Duwi, Y., Astuti, C. W., & Munifah, S. (2022). Kalimat Efektif Pada Kolom Berita Koran Seputar Ponorogo Bulan Februari-Mei 2021. Jurnal Pendidikan Bahasa Dan Sastra Indonesia, 2(1), 42–48. https://jurnal.stkippgriponorogo.ac.id/index.php/Leksis/article/view/165
Fikri, M. El, Pane, D. N., & Ahmad, R. (2020). Factors Affecting Readers ’ Satisfaction In " Waspada " Newspapers : Insight From Indonesia. International Journal Of Research And Review Pyari). International Journal of Research and Review, 7(May), 357–371. https://doi.org/https://dx.doi.org/10.4444/ijrr.1002/1995
Fitriyah, V. D., & Hariono, B. (2023). Analisis Perbaikan dan Pemeliharaan Mesin Pencuci Tipe Raung Di PTPN XII Ngrangkah Pawon Kebun Pabrik Satak Kabupaten Kediri. Rona Teknik Pertanian, 16(2), 128–137. https://doi.org/10.17969/rtp.v16i2.32088
Irnain, U., & Hariono, B. (2023). Analisis Repair Maintenance dan Preventive Maintenance pada Mesin Huller di Industri Kopi. Jurnal Ilmiah Inovasi, 23(3), 251–258. https://doi.org/10.25047/jii.v23i3.3988
Islam, S. S., Letari, T., Fitirani, A., & Wardani, D. A. (2020). Analisis Preventive Maintenance Pada Mesin Produksi dengan Metode Fuzzy FMEA. JTT (Jurnal Teknologi Terpadu), 8(1), 13–20. https://doi.org/10.32487/jtt.v8i1.766
Leke, R. M. S., & Saifuddin, J. A. (2024). Proposed Total Productive Maintenance ( TPM ) Implementation to Increase Heading Machine Effectiveness Using Overall Equipment Effectiveness ( OEE ) Method on PT . XYZ. 5(2), 359–369. https://doi.org/10.22441/ijiem.v5i2.23832
Mahatma, A. V., & Aidil, J. (2023). Proposed Maintenance Plan for Maker Machinery with Reliability Centered Maintenance (RCM) Method and Maintenance Value Stream Mapping (MVSM) at PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 549. https://doi.org/10.22441/ijiem.v4i3.21445
Marpaung, K. F., & Bakhtiar, A. (2019). Analisis Kebijakan Maintenance Untuk Mengetahui Biaya Yang Paling Optimal Pada Mesin Multpacking System 023 (Studi Kasus pada PT Mayora Indah, Tnk Divisi Biskuit Jayanti). Jurnal Teknik Industri, 7(4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23016
Muhaemin, G., & Nugraha, A. E. (2022). Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ. Jurnal Ilmiah Wahana Pendidikan, 8(9), 205–219. https://doi.org/10.5281/zenodo.6645451
Nugraha, M., Sarmada, A., & Yulianto, A. D. (2021). Problem Related Paper Tension and Its Solution in Newspaper Production Using Web Offset Printing Machine. Kreator, 2(1). https://doi.org/10.46961/kreator.v3i2.296
Nurbani, S. N., & Seftiadie Y.P., J. (2019). Analisis Perbandingan Metode Preventive Maintenance Dan Corrective Maintenance Mesin Tenun Pada Departemen Weaving Di Pt. Bandung Sakura Textile Mills. Rekayasa Industri Dan Mesin (ReTIMS), 1(1), 22. https://doi.org/10.32897/retims.2019.1.1.178
Permana, I. I., & Arvianto, A. (2020). Analisis Preventive Dan Corrective Maintenance Loading Arm Pada Pt . Pertamina Tbbm Semarang. Wahana Teknik Sipil, 19(8), 1–9. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23056
Romadhon, A. S. K., & Trimarjoko, A. (2024). Markov Chain Method in Decision Implementation of Preventive Maintenance Scheduling to Reduce Equipment Downtime in PT . ADF Indonesia : Case Study. 5(1), 183–191. https://doi.org/10.22441/ijiem.v5i1.24820
Saroinsong, G. M., Patras, L. S., & Tulung, N. M. (2021). Analisys performance Circuit Breaker SF6 70kV at Sawangan Switchyard. Analisys Performance Circuit Breaker SF6 70kV at Sawangan Switchyard, 1–6. http://repo.unsrat.ac.id/id/eprint/5124
Sulaksana, R. M. T. (2023). Perancangan Alat Bantu Untuk Memperbaiki Postur Kerja Pada Aktivitas Menghitung Dan Menumpuk Koran Tribun Jabar. INNOVATIVE: Journal Of Social Science Researc, 4(1), 6281–6298. https://doi.org/10.31004/innovative.v4i1.8582
Taufik, M., Wijayanto, D., & Sofitra, M. (2019). Penentuan Prioritas Aset Peralatan Kritis Produksi PDAM XYZ dengan Metode Analytic Hierarchy Process. Jurnal TIN Universitas Tanjung Pura, 3(2), 33–42. https://jurnal.untan.ac.id/index.php/jtinUNTAN/article/view/35739
Wardhani, T. A. P., & Widjajati, E. P. (2023). Analysis of Total Productive Maintenance Using Overall Resource Effectiveness (ORE) Methods on Pellet Mill 3 Machine in PT. XYZ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(3), 578. https://doi.org/10.22441/ijiem.v4i3.21478
Widiasih, W., & Aziza, N. (2019). Dengan Mempertimbangkan Penjadwalan. 14(02), 68–76. https://doi.org/10.33005/tekmapro.v14i2.90
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









